Asia – Australia, New Zealand & the Pacific Islands
A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.
Oceania & Pacific · sea freight from Dalian
Dalian to Fremantle
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Sulu Sea · Celebes Sea · Makassar Strait · Lombok Strait
Lithium batteries for Fremantle go through Dayaowan, where Liaoning's first JT/T 1543 lithium export sailed in May 2025. On the way they face a southward passage towards Oceania, and they arrive at the port of Fremantle.
On the Australian side the ABF, the biosecurity rules and the state port authority each want paperwork early. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.
A sea cargo report 48 hours before arrival, a packing declaration with ISPM 15 timber, and state port rules for dangerous goods notice.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Fremantle and at customs in Australia.
Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
Dayaowan MSA reported in April 2024 that omissions and misdeclarations of lithium battery cargo were frequent because the rules are complex. Its answer was a dedicated desk and hotline, priority handling for EV batteries, and AI comparison of documents to cut down container openings: a comparison that flags any gap between the declaration and the paperwork behind it.
What Anxin does: We reconcile the UN number, classification, packing group, quantity and SDS across every document before filing, which is exactly what an automated comparison will test.
Ships for Fremantle take the Makassar Strait and the Lombok Strait, the line of Indonesia's archipelagic sea lane II under IMO resolution MSC.72(69). It is a well-used route, but it keeps the ship in Indonesian waters for several days.
What Anxin does: We make sure the DG declaration and emergency response information are complete and travel with the ship's documents for the whole voyage to Fremantle.
Australian Border Force requires the sea cargo report in the Integrated Cargo System at least 48 hours before the ship reaches its first Australian port on voyages of 48 hours or more, which covers every sailing from Dalian. If Fremantle is not the first port of call, the deadline runs from the earlier port.
What Anxin does: We give the carrier and any NVOCC final house bill data at booking, so the cargo report for Fremantle is lodged on time and matches the DG declaration.
Fremantle Ports requires dangerous cargo to be notified through Voyager VDC at least 48 hours before the ship enters port waters or berths. On a ship from Dalian the carrier's agent files it for Fremantle from the DG data in the booking.
What Anxin does: We give the carrier the UN number, class, packing group and quantity at booking so the Fremantle notification is not waiting on cargo details.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Australia import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Declaration flagged by document comparison; container opened | Dayaowan | Cross-document reconciliation before filing | Anxin with the declarant |
| Late cargo report delays release | First Australian port | House bill data sent early | Carrier / NVOCC |
Questions
Through Voyager VDC, at least 48 hours before the ship enters port waters or berths.
South through the Makassar Strait and the Lombok Strait, along Indonesia's archipelagic sea lane II (IMO resolution MSC.72(69)).
Dayaowan MSA reported in 2024 that omissions and misdeclarations of lithium battery cargo were frequent because the rules are complex, and it uses AI document comparison. Consistent data across the declaration, SDS and packing documents is the main defence.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Fremantle before any booking, and ask for missing battery documents first.
All destinations from Dalian · Australia ports

Share the cargo facts; we review the route in writing.
Request a Quote