Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
South & Southeast Asia · sea freight from Dalian
Dalian to Chattogram
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Bay of Bengal
Lithium batteries for Chattogram go out of Dalian, the north-east's gateway on the Yellow Sea. On the way they face the Indian Ocean monsoon corridor, and they arrive at the port of Chattogram.
On the Bangladeshi side DG need a Navy NOC and quick removal from the port. Below are 6 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
An Indian Ocean crossing whose season depends on the side: the southwest monsoon and two cyclone seasons in the north, a November–April cyclone season in the south-west, and piracy off Somalia.


Where this route gets difficult
Listed from loading in Dalian to import into Bangladesh, each with what we do about it.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
Sea ice forms every winter in the Bohai Sea and northern Yellow Sea. In winter 2021/22 China's marine forecast centre expected floating ice about 15 nautical miles out in the northern Yellow Sea, where Dalian's Dayaowan lies, and about 60 in Liaodong Bay, peaking from mid-January to mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
The India Meteorological Department describes two cyclone seasons in the North Indian Ocean, April–May and October–December, the latter being the main one. Port closures and vessels waiting out a storm push the arrival at Chattogram back.
What Anxin does: For sailings in those months we plan delivery with slack at Chattogram and confirm the carrier's revised arrival before booking onward transport.
Bangladesh requires a Navy no-objection certificate before dangerous goods are unloaded, backed by the documents listed by the National Board of Revenue. A battery container for Chattogram whose papers are incomplete can stay on board or wait at anchor.
What Anxin does: We send the carrier and consignee the DG declaration, safety data sheet and packing certificate before sailing, so the NOC application for Chattogram can be made early.
NBR rules require dangerous goods to conform to the IMDG Code and to be declared on the manifest with the correct class and technical name. A vague description such as 'batteries' for cargo to Chattogram is not enough and can hold the container.
What Anxin does: We give the carrier the exact proper shipping name, UN number and class for the manifest, matching the DG declaration.
Dangerous cargo must be removed from Chattogram within 72 hours of arrival under a 2022 directive, part of tighter DG rules after fires. Clearance for Chattogram has to be prepared before the ship arrives.
What Anxin does: We ask the consignee to lodge its entry and book transport before arrival, so the battery container can leave the port within the limit.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

We line up UN numbers, model names and package counts across the Dalian filings, the booking with the carrier and the documents for Bangladesh before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Chattogram.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Cyclone closes the port or delays arrival | North Indian Ocean, Apr–May and Oct–Dec | Slack in delivery plan | Carrier / consignee |
| Discharge delayed until the Navy NOC is issued | Bangladeshi port of discharge | Documents sent before sailing | Consignee, with documents from Anxin |
Questions
A Navy no-objection certificate, based on the documents the NBR lists.
The India Meteorological Department describes two North Indian Ocean seasons, April–May and October–December, the latter being the main one.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Chattogram before any booking, and ask for missing battery documents first.
All destinations from Dalian · Bangladesh ports

Share the cargo facts; we review the route in writing.
Request a Quote