Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
South & Southeast Asia · sea freight from Dalian
Dalian to Mundra
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean
This route runs through Dayaowan, where Liaoning's first JT/T 1543 lithium export sailed in May 2025, then follows a corridor across the Indian Ocean; at the far end is the port of Mundra.
On the Indian side the importer is an EPR producer and the Bill of Entry is due the day before arrival. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
India checks BIS registrations online, treats importers as EPR producers and wants the Bill of Entry early.


Where this route gets difficult
Listed from loading in Dalian to import into India, each with what we do about it.
Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
From June to September the south-west monsoon brings rough seas to the Arabian Sea and the Bay of Bengal. A container heading for Mundra in those months meets heavy rolling, which loosens a poorly braced load.
What Anxin does: In monsoon months we check blocking and bracing strictly on stuffing photos before sealing.
IMD puts the normal monsoon onset over Kerala at 1 June; in 2026 it came on 4 June and then spread north, reaching the whole country around mid-July. Battery cartons arriving at Mundra in this period need to stay dry through discharge and delivery.
What Anxin does: For monsoon-season arrivals at Mundra we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.
Under Section 46 of the Customs Act, the Bill of Entry for Mundra must be filed by the end of the day before arrival, and can go in 30 days ahead. Late filing means charges, so documents from Dalian need to reach the broker early.
What Anxin does: We send the importer's broker the invoice, packing list and BIS details as soon as the ship sails from Dalian, so the Bill of Entry can be filed early.
India's Battery Waste Management Rules 2022 treat importers as producers. The importer of batteries through Mundra must register with the CPCB and meet its extended producer responsibility obligations before selling them.
What Anxin does: At quotation we ask the importer for its CPCB producer registration, so the EPR point is settled before the first shipment.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Dalian export filings, the carrier booking and the India import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Late Bill of Entry charges | Indian port of discharge | Documents sent at sailing | Importer's broker |
Questions
They verify the registration on crsbis.in, including manufacturer, model and factory location, and refuse deferred or cancelled registrations.
Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.
Dayaowan MSA reported in 2024 that omissions and misdeclarations of lithium battery cargo were frequent because the rules are complex, and it uses AI document comparison. Consistent data across the declaration, SDS and packing documents is the main defence.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Mundra before any booking, and ask for missing battery documents first.
All destinations from Dalian · India ports

Share the cargo facts; we review the route in writing.
Request a Quote