Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Northeast Asia · sea freight from Dalian
Dalian to Shimizu
Yellow Sea · East China Sea
This route runs from Liaoning through Dalian's Dayaowan terminals, then follows an intra-Asia passage with no canal or chokepoint; at the far end is the port of Shimizu.
Japan adds PSE rules for the importer and 24-hour advance filing through NACCS. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
A short-sea Asian route with no canal or chokepoint, where typhoons in summer and the north-east monsoon in winter set the pace.


Where this route gets difficult
They run from the Dalian terminal through the voyage to Shimizu and the Japan import file.
According to Dayaowan MSA in April 2024, lithium battery cargo was often under-declared or misdeclared because the rules are complicated. It responded with a dedicated desk and hotline, priority for EV batteries, and AI-based document comparison intended to reduce container openings, which means any mismatch between the declaration and its supporting papers gets flagged.
What Anxin does: We reconcile the UN number, classification, packing group, quantity and SDS across every document before filing, which is exactly what an automated comparison will test.
The Bohai Sea and the northern Yellow Sea freeze every winter. For 2021/22 China's marine forecast centre expected floating ice around 15 nautical miles offshore in the northern Yellow Sea, where Dayaowan is, and around 60 in Liaodong Bay, with the peak between mid-January and mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. Short Yellow Sea crossings are the ones most exposed: a fog hold at either end can move the box to a later vessel, and the DG filings with it.
What Anxin does: In fog season we leave slack between stuffing and the DG cut-off and keep the filing data ready to amend.
Both the master and house bills for a container to Shimizu have to be reported to Japan Customs through NACCS before the ship leaves Dalian, as a rule 24 hours ahead. Customs screens the data and can order that high-risk cargo not be unloaded.
What Anxin does: We send the house B/L data, with the UN number and a precise battery description, to whoever files it well before the cut-off in Dalian.
MLIT classifies Shimizu as an International Hub Port. The routing of the box from Dalian to Shimizu should be confirmed at booking.
What Anxin does: We check with the carrier which service carries the Dalian box into Shimizu.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Japan import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Declaration flagged by document comparison; container opened | Dayaowan | Cross-document reconciliation before filing | Anxin with the declarant |
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Do-not-unload notice after missing or inaccurate advance data | Japanese port of discharge | House B/L data sent early and checked | NVOCC / carrier, with data from Anxin |
Questions
The Japanese business that imports them. It notifies METI within 30 days of starting the business, inspects the batteries and applies the PSE mark with its name; a customs agent alone does not count.
Typhoons occur all year in the western North Pacific, but most in August and September: the Japan Meteorological Agency's 1991–2020 averages are 5.7 and 5.0 typhoons in those months.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Shimizu before any booking, and ask for missing battery documents first.
All destinations from Dalian · Japan ports

Share the cargo facts; we review the route in writing.
Request a Quote