Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Oceania & Pacific · sea freight from Dalian
Dalian to Auckland
Yellow Sea · East China Sea · Solomon Sea
This route runs through Dayaowan, where Liaoning's first JT/T 1543 lithium export sailed in May 2025, then follows a southward passage towards Oceania; at the far end is the port of Auckland.
On the New Zealand side the cargo report, MPI's checks and product standards come first. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.


Where this route gets difficult
Listed from loading in Dalian to import into New Zealand, each with what we do about it.
Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
The Bohai Sea and the northern Yellow Sea freeze every winter. For 2021/22 China's marine forecast centre expected floating ice around 15 nautical miles offshore in the northern Yellow Sea, where Dayaowan is, and around 60 in Liaodong Bay, with the peak between mid-January and mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
The Bureau of Meteorology puts Australia's tropical cyclone season from 1 November to 30 April. The route to Auckland crosses the Coral or Solomon Sea, where cyclones form in that period and close ports on their track.
What Anxin does: For November–April sailings we build slack into delivery plans and pass on the carrier's revised arrival.
At Ports of Auckland, DG handling at the Fergusson Container Terminal and the multi-cargo berths is governed by the POAL Hazardous Substances & Dangerous Goods Code of Practice, and vessel arrival information is due at Harbour Control 48 hours before arrival. A battery container for Auckland is handled under that code.
What Anxin does: We make sure the carrier's DG details are complete so the terminal at Auckland can apply its code without queries.
FIGS data for 2024 put about 53 % of New Zealand's full international import TEU through Ports of Auckland. For Auckland, the Dalian box's entry and ICR should be prepared early.
What Anxin does: We send the consignee's broker the documents for the box from Dalian at sailing so the entry for Auckland can be lodged before arrival.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the New Zealand import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Cyclone closes the port or delays arrival | Coral / Solomon Sea, Nov–Apr | Slack in delivery plan | Carrier / consignee |
Questions
In an Inward Cargo Report through the Trade Single Window at least 48 hours before the vessel is expected.
The Bureau of Meteorology puts Australia's tropical cyclone season from 1 November to 30 April.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Auckland before any booking, and ask for missing battery documents first.
All destinations from Dalian · New Zealand ports

Share the cargo facts; we review the route in writing.
Request a Quote