Lithium battery freight focus Air · Sea · Land assessment Document-first planning
Shipment Status & Support

Europe · sea freight from Dalian

Shipping from Dalian to Teesport

Dalian to Teesport

Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel

Sea corridor illustration: Dalian to Teesport, United Kingdom Simplified map with a curved corridor from Dalian via Yellow Sea, Taiwan Strait, Malacca Strait, Indian Ocean, Bab-el-Mandeb, Suez Canal, Strait of Gibraltar, English Channel to Teesport. Illustration only; not a vessel track or schedule. CHINAINDIAAFRICAEUROPECENTRAL ASIANORTH ATLANTIC Taiwan StraitSingapore / MalaccaBab-el-MandebSuez CanalGibraltar DalianCHINA ORIGIN TeesportUNITED KINGDOM DalianBOHAI SEASHANDONGDEPARTURE AREA
  1. DalianChina origin
  2. Yellow Sea
  3. Taiwan Strait
  4. Malacca Strait
  5. Indian Ocean
  6. Bab-el-Mandeb
  7. Suez Canal
  8. Strait of Gibraltar
  9. English Channel
  10. TeesportUnited Kingdom
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Teesport go out of Dalian, the north-east's gateway on the Yellow Sea. On the way they face a lane whose routing, Suez or Cape of Good Hope, is decided service by service, and they arrive at the port of Teesport.

British importers report battery tonnage and chemistry each year and need a CDS subscription for customs. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.

What we need to start

  • Dalian Dayaowan export
  • Winter ice & spring fog
  • EU declaration of conformity
  • BPRN
  • S&S GB entry summary

Route profile

The Dalian → Teesport route in brief

Origin port

Dalian (Dayaowan)

North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.

Sea corridor

Asia – North & Atlantic Europe

The map shows the Suez corridor, but in September 2026 most Asia–North Europe capacity still sails round the Cape of Good Hope.

Blue harbour crane booms above a quay building in Dalian harbour
A loaded container ship on the horizon

Where this route gets difficult

5 pain points from Dalian to Teesport

Loading port first, then the sea leg, then Teesport and the United Kingdom market.

  1. Origin port

    A smaller flow under the new ship-carriage standard

    Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.

    What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.

  2. Sea corridor

    Container losses off South Africa

    Routing round Africa takes battery boxes past the Cape. The World Shipping Council counted 576 containers lost at sea in 2024, and the South African Maritime Safety Authority estimates around 200 of them, about 35%, were lost near the Cape; in August 2024 SAMSA reported 99 boxes lost from the CMA CGM Belem off Richards Bay and 46 from the MSC Antonio off Port St Johns in winter weather.

    What Anxin does: When the booking goes via the Cape, we apply the CINS stuffing checks (gaps, blocking, wall clearance) more strictly and ask for photos at every stage of packing.

  3. Import country

    Industrial battery producers register within 28 days and put the BPRN on paperwork

    In the UK the importer is usually the battery producer. Industrial and vehicle battery producers register with the Office for Product Safety and Standards on the NPWD within 28 days of first placing batteries on the market, report tonnage, chemistry and brand by 31 March, and must take waste industrial batteries back from end-users free of charge. Their BPRN goes on invoices and delivery notes to business customers.

    What Anxin does: For storage and industrial packs we ask the UK importer for its BPRN before booking and add it to the documents we prepare.

  4. Import country

    Bin symbol and capacity label under the 2008 regulations

    Great Britain still labels batteries under the Batteries and Accumulators (Placing on the Market) Regulations 2008: a crossed-out wheeled bin symbol of a set minimum size on every battery, moved to the packaging only when the battery is too small or cannot practically be marked, and a capacity in mAh or Ah on portable rechargeables and on the front of their packaging.

    What Anxin does: We compare carton and battery photos with the UK marking list before goods leave Dalian, because relabelling after discharge at Teesport means opening dangerous goods packages.

  5. Import country

    Portable batteries: a compliance scheme by 15 October

    A UK producer placing more than a tonne of portable batteries a year must be in a battery compliance scheme, joined by 15 October before the compliance year; the scheme registers and reports for it. Smaller producers register themselves on the NPWD and report their tonnage and chemistry by 31 January.

    What Anxin does: We ask the UK importer whether it is a large or small portable producer and which scheme covers it, and put battery weights per chemistry on the packing list.

Locator map of Teesport, United KingdomTeesport
Locator map in the same projection as the corridor map; the dot marks the listed port position (54.65°N, 1.13°W).
Close view of stacked blue and red shipping containers at the Port of Rotterdam

Documents & compliance

Checklist for Dalian → Teesport

These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

At the Dalian end

  • JT/T 1543 conformity evidence from the manufacturer
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable

Carrier and voyage

  • Routing (Suez or Cape of Good Hope) and any transhipment port stated on the booking confirmation
  • UN 38.3 test summary for every cell and battery type
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)

For import into United Kingdom

  • BPRN of the UK producer on invoices and delivery notes
  • UK haulier briefed with UN 3480 class 9 details for road carriage under ADR
  • Battery weight and chemistry per shipment for the importer's NPWD return
A cordless drill with its battery pack attached
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Dalian filings, the booking with the carrier and the documents for United Kingdom before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Teesport.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risk table for Dalian → Teesport

RiskWhereMitigationWho acts
Heavy weather off South AfricaCape of Good HopeCINS stuffing and blocking checks before sealingPacking site, checked by Anxin
Industrial batteries sold with no producer registrationImporter in the UKBPRN confirmed before bookingImporter
Batteries arrive without the bin symbol or capacity markingImporter in the UKPhotos checked against the UK marking list before loadingManufacturer / importer

Questions

Common questions on the Dalian → Teesport route

The crossed-out wheeled bin symbol at a minimum size, on the packaging if the battery is too small, and for portable rechargeables a capacity in mAh or Ah on the battery and the packaging front.

It depends on the service. In September 2026 most Asia–North Europe capacity still sailed round the Cape of Good Hope; Sea-Intelligence put the Red Sea share for North Europe vessels at 27%. We ask the carrier to confirm the routing on the booking and quote each routing separately.

Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.

References

Official sources for this page

  1. Waste batteries: producer responsibility (Environment Agency (GOV.UK))
  2. The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2009, regulation 5 (legislation.gov.uk)
  3. Regulations: waste batteries (GOV.UK (Office for Product Safety and Standards))
  4. Regulations: batteries and accumulators (placing on the market) (GOV.UK (Office for Product Safety and Standards))
  5. Search on for containers lost overboard off South Africa's Indian Ocean coast (South African Maritime Safety Authority)
  6. Sea ice arrives: what are the impacts? (Bohai and northern Yellow Sea, winter 2021/22) (China Meteorological Administration (from China Natural Resources News))
  7. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Dalian
  5. 5ImportClearance at Teesport
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Dalian → Teesport

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Dalian → Teesport before any booking, and ask for missing battery documents first.

All destinations from Dalian · United Kingdom ports

Workers loading cartons from pallets by hand in a warehouse

Need Dalian → Teesport reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp