Lithium battery freight focus Air · Sea · Land assessment Document-first planning

South & Southeast Asia · sea freight from Guangzhou

Shipping from Guangzhou to Makassar

Guangzhou to Makassar

South China Sea · Balabac Strait · Sulu Sea · Celebes Sea · Makassar Strait

Sea corridor illustration: Guangzhou to Makassar, Indonesia Simplified map with a curved corridor from Guangzhou via South China Sea, Balabac Strait, Sulu Sea, Celebes Sea, Makassar Strait to Makassar. Illustration only; not a vessel track or schedule. BORNEONEW GUINEAINDIAN OCEAN Balabac StraitMakassar Strait GuangzhouCHINA ORIGIN MakassarINDONESIA GuangzhouSOUTH CHINA SEAGUANGDONGDEPARTURE AREA
  1. GuangzhouChina origin
  2. South China Sea
  3. Balabac Strait
  4. Sulu Sea
  5. Celebes Sea
  6. Makassar Strait
  7. MakassarIndonesia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Makassar go out of Nansha, at the mouth of the Pearl River. On the way they face Southeast Asian waters, with their typhoon and monsoon seasons, and they arrive at the port of Makassar.

On the Indonesian side the importer's approvals matter: SNI for primary cells and an import approval for used batteries. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Dongguan–Nansha one-box
  • Typhoon season Jun–Oct
  • Used-battery approval
  • 24-hour arrival notice
  • SNI for primary cells

Route profile

The Guangzhou → Makassar route in brief

Origin port

Guangzhou (Nansha)

Pearl River Delta battery cargo through Nansha, where a September 2026 agreement lets Dongguan-inspected containers load without a second MSA check, and where typhoon season runs June to October.

Import country

Indonesia

Arrival notice and manifest before unloading, SNI for primary batteries, and controlled imports for anything used.

Elevated section of the Nansha Port Railway on concrete piers in Guangzhou's Nansha district
A loaded container ship on the horizon

Where this route gets difficult

5 pain points from Guangzhou to Makassar

They run from the Guangzhou terminal through the voyage to Makassar and the Indonesia import file.

  1. Origin port

    One-box inspection now reaches Nansha

    Since 22 September 2026 Guangzhou MSA accepts Dongguan MSA's factory inspection for boxes loading at Nansha and re-inspects only when necessary. The first container was stuffed in Dongguan that day and left Nansha for Singapore on 24 September. Because the arrangement is new at Nansha, the factory record needs to be correct the first time.

    What Anxin does: We ask at booking whether your Dongguan factory can use the Nansha one-box arrangement and make sure the stuffing photos, packing certificate and DG declaration match, because a mismatch is the 'necessary' case that brings the second inspection back.

  2. Origin port

    A recommended 25% charge for ESS from Nansha

    Nansha MSA told a July 2024 meeting on energy-storage carriage that ESS batteries should travel at roughly 25% state of charge, with accidental activation prevented. It is advice, not a binding rule, yet it is the number the local authority has put on the record.

    What Anxin does: For ESS cargo leaving Nansha we ask the manufacturer to state the shipping state of charge and the anti-activation measures in writing, and put both in the documents the carrier sees.

  3. Sea corridor

    Typhoon season on the run to Makassar

    The Japan Meteorological Agency counts an average of 25.1 typhoons a year in the western North Pacific, most of them in August and September. On the run to Makassar a storm can shut the loading port in China or the discharge port for a day or more, and the dangerous goods filings then have to follow the box to its next vessel.

    What Anxin does: In typhoon months we check the carrier's DG acceptance for the next two vessels as well, so a rolled container can be refiled quickly rather than rebooked from scratch.

  4. Import country

    PIB registration depends on storage and manifest numbers

    Indonesia registers the PIB once duties are settled, restrictions are met, and the goods sit at a TPS with an Inward Manifest number. For Makassar, that sequence should be planned for the Guangzhou box.

    What Anxin does: We tell the declarant the expected arrival of the box from Guangzhou so the PIB conditions can be prepared.

  5. Import country

    Used batteries need an import approval and surveyor report

    Permendag 24/2025 treats batteries that are not new as controlled imports: the importer needs a business number with an API-P, an import approval and a surveyor's report, all through INSW. Refurbished or second-life packs for Makassar cannot simply be booked as general cargo.

    What Anxin does: We ask whether the batteries are new at quotation, and for anything used we wait for the importer's approval before booking.

Locator map of Makassar, IndonesiaMakassar
Locator map in the same projection as the corridor map; the dot marks the listed port position (5.13°S, 119.40°E).
Silhouettes of container cranes at sunrise at Laem Chabang

Documents & compliance

What to have ready: Guangzhou to Makassar

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

In Guangzhou, before the box is loaded

  • For ESS: written shipping state of charge and anti-activation measures from the manufacturer
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • Blocking and bracing photos for monsoon-season sailings
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)

For the shipping line

  • DG acceptance confirmed for a back-up vessel in typhoon months
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards

For import into Indonesia

  • Import approval and surveyor report for used batteries
  • SNI certificate for any primary cells in the shipment
An electric scooter parked by a wall
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Guangzhou export filings, the carrier booking and the Indonesia import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risks on this route and who deals with them

RiskWhereMitigationWho acts
Second inspection at Nansha because factory records are incompleteDongguan factory → NanshaPhotos, packing certificate and declaration matched before truckingAnxin
Typhoon closes a port; the box moves to a later vesselSoutheast Asian ports, Jul-OctBack-up vessel with DG acceptance; prompt refilingAnxin with the carrier

Questions

Questions about shipping from Guangzhou to Makassar

The arrival notice goes in at least 24 hours before arrival for voyages of 24 hours or more, and the inward manifest before unloading.

From about November to March the north-east monsoon brings rough seas in the southern South China Sea. It rarely stops sailings, but it tests the stowage, so bracing matters more.

Nansha MSA has recommended around 25% for ESS batteries and measures against accidental activation. Treat it as the local authority's recommendation; the carrier's own acceptance conditions also apply.

References

Official sources for this page

  1. Impor Untuk Dipakai (Direktorat Jenderal Bea dan Cukai (Indonesia))
  2. Permendag No. 24 Tahun 2025: import of goods in non-new condition and non-hazardous waste (Kementerian Hukum (peraturan.go.id))
  3. PMK 158/PMK.04/2017 on arrival notification, inward manifest and outward manifest (Kementerian Keuangan (JDIH))
  4. Weather phenomena: Northeast Monsoon (Malaysian Meteorological Department (MetMalaysia))
  5. Nansha MSA meeting on the safe carriage of energy-storage batteries (Guangzhou Nansha District Government)
  6. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Guangzhou
  5. 5ImportClearance at Makassar
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Guangzhou → Makassar

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Guangzhou → Makassar before any booking, and ask for missing battery documents first.

All destinations from Guangzhou · Indonesia ports

A forklift loading goods into an open shipping container

Need Guangzhou → Makassar reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp