Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Africa · sea freight from Guangzhou

Shipping from Guangzhou to Port Réunion

Guangzhou to Port Réunion

South China Sea · Malacca Strait · Andaman Sea · Indian Ocean

Sea corridor illustration: Guangzhou to Port Réunion, Réunion Simplified map with a curved corridor from Guangzhou via South China Sea, Malacca Strait, Andaman Sea, Indian Ocean to Port Réunion. Illustration only; not a vessel track or schedule. INDIAAUSTRALIAAFRICASOUTH CHINA SEAINDIAN OCEAN Singapore / Malacca GuangzhouCHINA ORIGIN Port RéunionRÉUNION GuangzhouSOUTH CHINA SEAGUANGDONGDEPARTURE AREA
  1. GuangzhouChina origin
  2. South China Sea
  3. Malacca Strait
  4. Andaman Sea
  5. Indian Ocean
  6. Port RéunionRéunion
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Port Réunion go through Guangzhou's Nansha terminals, which since September 2026 accept Dongguan-inspected battery boxes without a second check. On the way they face the Malacca Strait and then the Indian Ocean, and they arrive at the port of Port Réunion.

Réunion applies EU product and customs rules, plus the octroi de mer. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Dongguan–Nansha one-box
  • Typhoon season Jun–Oct
  • Octroi de mer
  • Consignee EORI
  • EU declaration of conformity

Route profile

What sets Guangzhou → Port Réunion apart

Origin port

Guangzhou (Nansha)

Pearl River Delta battery cargo through Nansha, where a September 2026 agreement lets Dongguan-inspected containers load without a second MSA check, and where typhoon season runs June to October.

Sea corridor

Asia – Indian Ocean

After the Malacca Strait comes the Indian Ocean, where the south-west monsoon and two cyclone seasons decide the pace.

Elevated section of the Nansha Port Railway on concrete piers in Guangzhou's Nansha district
A loaded container ship on the horizon

Where this route gets difficult

What to watch between Guangzhou and Port Réunion: 6 points

Listed from loading in Guangzhou to import into Réunion, each with what we do about it.

  1. Origin port

    Customs and MSA now compare packaging certificates

    In September 2026 Dongguan Customs and Dongguan MSA started sharing dangerous-goods packaging certificate data, described as a first in China, together with joint action against concealed and false declarations; Huangpu Customs also runs a joint 'lithium batteries going overseas' service against misdeclaration. A packaging certificate that does not match the MSA filing is now visible to both agencies.

    What Anxin does: We check that the UN number, packaging code and quantities on the packaging certificate are exactly those on the MSA cargo report before either is submitted.

  2. Origin port

    Nansha MSA's state-of-charge advice for energy storage

    At a July 2024 meeting on energy-storage carriage, Nansha MSA recommended shipping ESS batteries at a state of charge of around 25% and preventing accidental activation. It is a recommendation rather than a fixed rule, but it is the figure the local authority has put on record.

    What Anxin does: For ESS cargo leaving Nansha we ask the manufacturer to state the shipping state of charge and the anti-activation measures in writing, and put both in the documents the carrier sees.

  3. Sea corridor

    South-west Indian Ocean cyclones, November to April

    Météo-France La Réunion counted 11 named storms, 6 of them tropical cyclones, in the 2025–26 south-west Indian Ocean season (15 November to 30 April), an above-normal year in which Madagascar was hit twice. Sailings to Port Réunion in those months can meet port closures or diversions.

    What Anxin does: For November–April sailings we build slack into the delivery plan and track the carrier's revised arrival.

  4. Import country

    The ICS2 entry summary is due before loading in Guangzhou

    For Port Réunion, EU security pre-filing happens at the other end of the voyage: the ICS2 entry summary must reach the system 24 hours before the container is loaded in Guangzhou. No filing means no loading, and a missing EORI number is enough to reject it.

    What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Guangzhou cut-off.

  5. Import country

    Battery label from August 2026, QR code from February 2027

    Two marking dates fall into current shipping plans for Réunion: the general label from 18 August 2026 and the QR code from 18 February 2027, which for EV, LMT and larger industrial batteries has to open the battery passport.

    What Anxin does: Before booking we ask the Réunion importer to confirm the battery category and whether the label and QR-code elements are already on the goods, and compare carton photos with that answer.

  6. Import country

    CE marking and a declaration of conformity in the right language

    The importer in Réunion carries the check: CE marking on the battery and an EU declaration of conformity, translated into the language Réunion asks for, have both been required since 18 August 2024 for batteries entering the EU market.

    What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Réunion importer. We check that the documents exist and match the goods; we do not assess conformity.

Locator map of Port Réunion, RéunionPort Réunion
Locator map in the same projection as the corridor map; the dot marks the listed port position (20.93°S, 55.32°E).
Container stacks and cranes at the Port of Mombasa

Documents & compliance

Documents to line up for Guangzhou → Port Réunion

Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

At the Guangzhou end

  • Packaging certificate and MSA cargo report cross-checked line by line (UN number, packaging code, quantity)
  • For ESS: written shipping state of charge and anti-activation measures from the manufacturer
  • EU declaration of conformity and CE marking photo from the manufacturer
  • Importer name, trade name and postal address printed on battery or packaging
  • Substance declaration covering mercury, cadmium and lead limits

Carrier and voyage

  • Consignee EORI and HS-level description to the ENS filer before loading
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)

At the Réunion end

  • Label and QR-code status against the August 2026 and February 2027 dates
  • HS code agreed so the importer can check the octroi de mer rate
An electric scooter parked by a wall
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Guangzhou export filings, the carrier booking and the Réunion import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Guangzhou to Port Réunion, and who acts

RiskWhereMitigationWho acts
Mismatch between packaging certificate and MSA filing flagged by shared dataDongguan / NanshaLine-by-line check before submissionAnxin with the declarant
Cyclone closes the port or delays arrivalSouth-west Indian Ocean, Nov–AprSlack in delivery planCarrier / consignee
Declaration of conformity missing or not in the required languageImporter in RéunionDeclaration and CE photo collected before loadingManufacturer / importer
ENS not filed and the box is refused at loadingLoading port, GuangzhouEORI and house-bill data passed to the filer at bookingFiler (carrier / forwarder)

Questions

Common questions on the Guangzhou → Port Réunion route

Yes. Activity is suspended and the gantries are anchored; after Cyclone Belal in 2024 operations resumed within three days.

Yes. The south-west Indian Ocean season runs from mid-November to the end of April; Météo-France counted 11 named storms in 2025–26.

Nansha MSA has recommended around 25% for ESS batteries and measures against accidental activation. Treat it as the local authority's recommendation; the carrier's own acceptance conditions also apply.

References

Regulations and port sources cited

  1. L'octroi de mer à La Réunion (Direction Générale des Douanes et Droits Indirects)
  2. Réorganisation et sécurisation du port Est (Grand Port Maritime de La Réunion)
  3. Rapport d'activités 2024 (Grand Port Maritime de La Réunion)
  4. Regulation (EU) 2023/1542 on batteries and waste batteries (ELI) (EUR-Lex / Publications Office of the EU)
  5. ICS2 Release 3: Prepare your business for sending goods to or via the EU by sea and inland waterways (European Commission, DG TAXUD (leaflet KP0423828ENN))
  6. Regulation (EU) 2023/1542 concerning batteries and waste batteries (Official Journal PDF) (EUR-Lex / Publications Office of the EU)
  7. 2025–2026 south-west Indian Ocean cyclone season review (Météo-France La Réunion)
  8. Nansha MSA meeting on the safe carriage of energy-storage batteries (Guangzhou Nansha District Government)
  9. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Guangzhou
  5. 5ImportClearance at Port Réunion
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Guangzhou → Port Réunion

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Guangzhou → Port Réunion before any booking, and ask for missing battery documents first.

All destinations from Guangzhou · Réunion ports

Workers loading cartons from pallets by hand in a warehouse

Need Guangzhou → Port Réunion reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp