Asia – Australia, New Zealand & the Pacific Islands
A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.
Oceania & Pacific · sea freight from Lianyungang
Lianyungang to Townsville
Yellow Sea · East China Sea · Solomon Sea · Jomard Passage · Coral Sea
This route runs out of Lianyungang, where the MSA simplified 'new three' filings in 2024, then follows a southward passage towards Oceania; at the far end is the port of Townsville.
On the Australian side the ABF, the biosecurity rules and the state port authority each want paperwork early. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.
A sea cargo report 48 hours before arrival, a packing declaration with ISPM 15 timber, and state port rules for dangerous goods notice.


Where this route gets difficult
Listed from loading in Lianyungang to import into Australia, each with what we do about it.
Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
Australia's brown marmorated stink bug measures apply to goods shipped from 1 September to 30 April, judged by the shipped-on-board date on the bill of lading. Chapter 85, which covers batteries, is a target high-risk chapter; goods from China, listed as an emerging risk country, may be picked for random onshore inspection, and if the container is transhipped through a target risk country treatment can become mandatory.
What Anxin does: We ask the carrier to confirm the transhipment port for Townsville before booking so that the BMSB status is known, and make sure the bill of lading shows the shipped-on-board date.
Since 22 June 2022 consumer products sold in Australia that contain button or coin batteries must have secure compartments, child-resistant packaging, warnings and compliance testing. It applies to the product, not the shipment, but goods arriving at Townsville that do not comply cannot be supplied.
What Anxin does: For consumer goods with button or coin cells we ask the importer for its test reports and packaging artwork before production ends in Lianyungang.
Wooden pallets and crates under battery cargo must be ISPM 15 treated and marked, and the packer declares that the container was cleaned and free of unacceptable packaging. Missing or inconsistent paperwork can send the container for Townsville to inspection.
What Anxin does: We check that the pallets are ISPM 15 marked and that the packer's declaration is signed before the container leaves Lianyungang.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for Australia before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Townsville.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Container selected for BMSB inspection or treatment | Australian border, Sep–Apr | Transhipment port and B/L date checked | Importer, supported by Anxin |
| Container sent for biosecurity inspection over packing paperwork | Australian port of discharge | Signed packing declaration; ISPM 15 timber | Packer, checked by Anxin |
Questions
Unacceptable packaging such as straw or soil, the ISPM 15 status of any timber and a statement that the container was cleaned.
The Bureau of Meteorology puts Australia's tropical cyclone season from 1 November to 30 April.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Townsville before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Australia ports

Share the cargo facts; we review the route in writing.
Request a Quote