Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Cochin
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean
Lithium batteries for Cochin go out of Lianyungang, where the MSA simplified 'new three' filings in 2024. On the way they face a corridor across the Indian Ocean, and they arrive at the port of Cochin.
India adds BIS registration for lithium cells and batteries, checked online by customs. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
BIS registration verified model by model, EPR registration for importers, and a Bill of Entry due before the ship arrives.


Where this route gets difficult
They run from the Lianyungang terminal through the voyage to Cochin and the India import file.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
Lianyungang MSA's Notice No. 1 of 2024 cut the materials for 'new three' cargo to four on the cargo side: the safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where packaged, and a power of attorney. Fewer papers means each one carries more weight; the packing certificate still has to be signed by a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
Colombo is the main transhipment hub for Indian cargo: 8.29 million TEU in 2025, about 81% transhipment, around 45% of it India-linked. For Cochin, a relay there means a second vessel whose DG acceptance matters as much as the first.
What Anxin does: We ask the carrier at booking whether the service to Cochin relays in Colombo or elsewhere, and check that the DG acceptance covers the feeder leg too.
The India Meteorological Department dates the south-west monsoon's arrival over Kerala to around 1 June (4 June in 2026), after which it moves north and covers the whole country by about mid-July. From then until the season ends, arrivals at Cochin meet monsoon rain on the quay and on the roads inland.
What Anxin does: For monsoon-season arrivals at Cochin we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.
Cochin's Vallarpadam terminal sits on a 14.5 m channel; deepening to 16 m is proposed but planned only for 2028-29, and transhipment there roughly halved in FY26 as traffic moved to Vizhinjam. Larger ships may skip Cochin, so a container can come on a feeder from another hub.
What Anxin does: We check whether the service to Cochin calls directly or relays, and confirm DG acceptance on every leg.
Cochin handled 38.06 million tonnes in 2025-26, a change of +0.84 %, with 25.00 million tonnes overseas and 13.06 million tonnes coastal (Ministry of Ports, Shipping and Waterways). For Cochin, the box from Lianyungang should have its routing and terminal confirmed with the carrier.
What Anxin does: We send the consignee's customs broker the invoice, packing list and DG documents for the box from Lianyungang at sailing so the Bill of Entry for Cochin can be filed before arrival.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the India import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
Questions
By the end of the day before the vessel arrives; it may be filed up to 30 days in advance.
Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Cochin before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · India ports

Share the cargo facts; we review the route in writing.
Request a Quote