Lithium battery freight focus Air · Sea · Land assessment Document-first planning

South & Southeast Asia · sea freight from Lianyungang

Shipping from Lianyungang to Mundra

Lianyungang to Mundra

Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean

Sea corridor illustration: Lianyungang to Mundra, India Simplified map with a curved corridor from Lianyungang via Yellow Sea, East China Sea, Taiwan Strait, South China Sea, Malacca Strait, Andaman Sea, Indian Ocean to Mundra. Illustration only; not a vessel track or schedule. CHINAINDIASOUTH CHINA SEA Taiwan StraitSingapore / MalaccaSouth of Sri Lanka LianyungangCHINA ORIGIN MundraINDIA LianyungangYELLOW SEASHANDONGJIANGSUDEPARTURE AREA
  1. LianyungangChina origin
  2. Yellow Sea
  3. East China Sea
  4. Taiwan Strait
  5. South China Sea
  6. Malacca Strait
  7. Andaman Sea
  8. Indian Ocean
  9. MundraIndia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs from northern Jiangsu through Lianyungang on the Yellow Sea, then follows a corridor across the Indian Ocean; at the far end is the port of Mundra.

On the Indian side the importer is an EPR producer and the Bill of Entry is due the day before arrival. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Lianyungang export
  • Break-bulk ESS guide
  • BIS CRS
  • CPCB EPR
  • Advance Bill of Entry

Route profile

How Lianyungang → Mundra differs from other lanes

Origin port

Lianyungang

Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.

Import country

India

For India, the BIS registration has to match exactly and the Bill of Entry goes in before arrival.

Aerial view over the Port of Lianyungang with berths, rail lines and cargo yards
A cargo ship at anchor in calm water under a clear sky

Where this route gets difficult

What to watch between Lianyungang and Mundra: 6 points

They run from the Lianyungang terminal through the voyage to Mundra and the India import file.

  1. Origin port

    Four cargo-side documents at Lianyungang, each checked

    Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.

    What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.

  2. Origin port

    Lianyungang's break-bulk guide for ESS

    For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.

    What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.

  3. Sea corridor

    Two cyclone seasons in the North Indian Ocean

    The India Meteorological Department describes two cyclone seasons in the North Indian Ocean, April–May and October–December, the latter being the main one. Port closures and vessels waiting out a storm push the arrival at Mundra back.

    What Anxin does: For sailings in those months we plan delivery with slack at Mundra and confirm the carrier's revised arrival before booking onward transport.

  4. Import country

    crsbis.in decides: manufacturer, model and factory must match

    Indian customs now verify BIS registrations online (CBIC Instruction 27/2025). If the manufacturer, model or factory location on the documents for Mundra differs from crsbis.in, or the registration is deferred or cancelled, the goods are not cleared.

    What Anxin does: We compare the model numbers and factory address on the invoice with the registration shown on crsbis.in before the goods leave Lianyungang.

  5. Import country

    The south-west monsoon reaches the west coast in June

    The India Meteorological Department dates the south-west monsoon's arrival over Kerala to around 1 June (4 June in 2026), after which it moves north and covers the whole country by about mid-July. From then until the season ends, arrivals at Mundra meet monsoon rain on the quay and on the roads inland.

    What Anxin does: For monsoon-season arrivals at Mundra we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.

  6. Import country

    Importers are battery producers under EPR

    India's Battery Waste Management Rules 2022 treat importers as producers. The importer of batteries through Mundra must register with the CPCB and meet its extended producer responsibility obligations before selling them.

    What Anxin does: At quotation we ask the importer for its CPCB producer registration, so the EPR point is settled before the first shipment.

Locator map of Mundra, IndiaMundra
Locator map in the same projection as the corridor map; the dot marks the listed port position (22.73°N, 69.71°E).
Container ship and stacked containers at the Port of Colombo

Documents & compliance

What to have ready: Lianyungang to Mundra

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Before loading in Lianyungang

  • The four cargo-side documents under Lianyungang MSA Notice 2024 No. 1 prepared together and cross-checked
  • For ESS: UN3480 or UN3536 confirmed, state of charge and circuit isolation stated in writing
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • BIS R-number checked against model and factory on crsbis.in

For the carrier and the voyage

  • Carrier's revised arrival reconfirmed in the cyclone season before booking onward transport
  • Relay port and feeder DG acceptance confirmed for Indian destinations
  • UN 38.3 test summary for every cell and battery type

At the India end

  • Importer's CPCB producer registration
  • Documents with the broker in time for the advance Bill of Entry
A cylindrical lithium-ion cell held between two fingers
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for India before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Mundra.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risks on this route and who deals with them

RiskWhereMitigationWho acts
ESS unit not isolated or poorly distributed in a break-bulk holdLianyungang, break-bulk loadingManufacturer's written isolation steps; safety meetingManufacturer / ship, coordinated by Anxin
One of the four documents inconsistent with the othersLianyungang MSA filingCross-check before submissionAnxin with the declarant
Cyclone closes the port or delays arrivalNorth Indian Ocean, Apr–May and Oct–DecSlack in delivery planCarrier / consignee
Clearance refused for a registration mismatchIndian port of dischargeRegistration checked before shipmentManufacturer and importer

Questions

Questions about shipping from Lianyungang to Mundra

By the end of the day before the vessel arrives; it may be filed up to 30 days in advance.

Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.

Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Lianyungang
  5. 5ImportClearance at Mundra
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Lianyungang → Mundra

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Lianyungang → Mundra before any booking, and ask for missing battery documents first.

All destinations from Lianyungang · India ports

A forklift moving palletised cartons in a warehouse

Need Lianyungang → Mundra reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp