Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Mundra
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean
This route runs from northern Jiangsu through Lianyungang on the Yellow Sea, then follows a corridor across the Indian Ocean; at the far end is the port of Mundra.
On the Indian side the importer is an EPR producer and the Bill of Entry is due the day before arrival. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
For India, the BIS registration has to match exactly and the Bill of Entry goes in before arrival.


Where this route gets difficult
They run from the Lianyungang terminal through the voyage to Mundra and the India import file.
Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The India Meteorological Department describes two cyclone seasons in the North Indian Ocean, April–May and October–December, the latter being the main one. Port closures and vessels waiting out a storm push the arrival at Mundra back.
What Anxin does: For sailings in those months we plan delivery with slack at Mundra and confirm the carrier's revised arrival before booking onward transport.
Indian customs now verify BIS registrations online (CBIC Instruction 27/2025). If the manufacturer, model or factory location on the documents for Mundra differs from crsbis.in, or the registration is deferred or cancelled, the goods are not cleared.
What Anxin does: We compare the model numbers and factory address on the invoice with the registration shown on crsbis.in before the goods leave Lianyungang.
The India Meteorological Department dates the south-west monsoon's arrival over Kerala to around 1 June (4 June in 2026), after which it moves north and covers the whole country by about mid-July. From then until the season ends, arrivals at Mundra meet monsoon rain on the quay and on the roads inland.
What Anxin does: For monsoon-season arrivals at Mundra we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.
India's Battery Waste Management Rules 2022 treat importers as producers. The importer of batteries through Mundra must register with the CPCB and meet its extended producer responsibility obligations before selling them.
What Anxin does: At quotation we ask the importer for its CPCB producer registration, so the EPR point is settled before the first shipment.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for India before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Mundra.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Cyclone closes the port or delays arrival | North Indian Ocean, Apr–May and Oct–Dec | Slack in delivery plan | Carrier / consignee |
| Clearance refused for a registration mismatch | Indian port of discharge | Registration checked before shipment | Manufacturer and importer |
Questions
By the end of the day before the vessel arrives; it may be filed up to 30 days in advance.
Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Mundra before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · India ports

Share the cargo facts; we review the route in writing.
Request a Quote