Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
Northeast Asia · sea freight from Lianyungang
Lianyungang to Kobe
Yellow Sea · East China Sea
Lithium batteries for Kobe go from northern Jiangsu through Lianyungang on the Yellow Sea. On the way they face an intra-Asia passage with no canal or chokepoint, and they arrive at the port of Kobe.
Japan adds PSE rules for the importer and 24-hour advance filing through NACCS. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
A short-sea Asian route with no canal or chokepoint, where typhoons in summer and the north-east monsoon in winter set the pace.


Where this route gets difficult
Loading port first, then the sea leg, then Kobe and the Japan market.
Lianyungang MSA's Notice No. 1 of 2024 cut the materials for 'new three' cargo to four on the cargo side: the safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where packaged, and a power of attorney. Fewer papers means each one carries more weight; the packing certificate still has to be signed by a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
The Japan Meteorological Agency counts an average of 25.1 typhoons a year in the western North Pacific, with the most in August and September. On a short route the voyage is quick, but a storm can close the loading or discharge port for days, and the DG filings follow the box to whichever vessel it ends up on.
What Anxin does: For July–October sailings to Kobe we confirm the DG cut-off a week ahead and refile promptly if the vessel changes.
Japan lets importers lodge documents before arrival for advance examination, with a possible inspection later. For Kobe, the Lianyungang cargo documents must be complete early.
What Anxin does: We make sure the invoice and battery description for Lianyungang are final so the consignee can use pre-arrival examination.
Japan issues an import permit only after the declaration has been examined, and the declaration is in general made once the goods are in a bonded area; a customs broker usually files it for the importer. The consignee for Kobe should name the broker before the box from Lianyungang arrives.
What Anxin does: We ask the consignee for the Japanese customs broker's name and send that party the Lianyungang documents early.
Under Japan's Port Regulations Act a ship carrying dangerous goods of the categories MLIT lists must seek the port captain's directions outside the port limits before entering a specified port such as Kobe, anchor or moor where the captain says, and get permission to load, transship or unload them. The ship's side needs accurate DG data well before arrival.
What Anxin does: We confirm the DG class, UN number and quantities on the carrier's manifest before sailing, so the ship's agent has what it needs for the port captain.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for Japan before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Kobe.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Typhoon closes a port; box moves to another vessel | Western North Pacific, Jul–Oct | DG cut-off confirmed; prompt refiling | Anxin with the declarant |
Questions
Through NACCS no later than 24 hours before the ship leaves the loading port, for both master and house bills, with a relaxed deadline on certain short routes.
Typhoons occur all year in the western North Pacific, but most in August and September: the Japan Meteorological Agency's 1991–2020 averages are 5.7 and 5.0 typhoons in those months.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Kobe before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Japan ports

Share the cargo facts; we review the route in writing.
Request a Quote