Asia – Southeast Asian seas
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Cagayan de Oro
Yellow Sea · East China Sea · Philippine Sea · Bohol Sea
This route runs out of Lianyungang, where the MSA simplified 'new three' filings in 2024, then follows a Southeast Asian sea passage with no canal on the way; at the far end is the port of Cagayan de Oro.
The Philippines adds an advance manifest due 24 or 48 hours before arrival. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.
For the Philippines, the manifest comes early and only accredited importers can lodge entries.


Where this route gets difficult
Loading port first, then the sea leg, then Cagayan de Oro and the Philippines market.
Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
The Japan Meteorological Agency counts an average of 25.1 typhoons a year in the western North Pacific, most of them in August and September. On the run to Cagayan de Oro a storm can shut the loading port in China or the discharge port for a day or more, and the dangerous goods filings then have to follow the box to its next vessel.
What Anxin does: In typhoon months we check the carrier's DG acceptance for the next two vessels as well, so a rolled container can be refiled quickly rather than rebooked from scratch.
The Bureau of Customs treats goods as impliedly abandoned if assessed duties are not paid within 15 days of final assessment or the goods are not claimed within 30 days of payment. The consignee for Cagayan de Oro should plan payment and pick-up for the box from Lianyungang.
What Anxin does: We tell the consignee the expected arrival of the box from Lianyungang so payment and pick-up can be planned.
Philippine customs want the manifest 24 hours before arrival on short voyages and 48 hours on those over 72 hours, with separate deadlines for consolidators. From Lianyungang, that means the battery details must be final at booking.
What Anxin does: We give the carrier or consolidator the final cargo and DG data before sailing from Lianyungang, so the Philippine manifest is filed complete.
In the Philippines the goods declaration must be lodged electronically within 15 days from discharge of the last package, with a single extension only if it is requested before the period ends. The broker for Cagayan de Oro needs the Lianyungang documents before the vessel arrives.
What Anxin does: We send the invoice, packing list and battery description for Lianyungang to the consignee's broker ahead of the vessel.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for Philippines before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Cagayan de Oro.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Typhoon closes a port; the box moves to a later vessel | Southeast Asian ports, Jul-Oct | Back-up vessel with DG acceptance; prompt refiling | Anxin with the carrier |
Questions
Twenty-four hours before arrival for voyages of 72 hours or less, 48 hours for longer ones, under CAO 15-2020.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Cagayan de Oro before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Philippines ports

Share the cargo facts; we review the route in writing.
Request a Quote