Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Manila
Yellow Sea · East China Sea · Taiwan Strait · South China Sea
Lithium batteries for Manila go through Lianyungang port. On the way they face a Southeast Asian sea passage with no canal on the way, and they arrive at the port of Manila.
In the Philippines the importer must be accredited in CPRS before any entry is lodged. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.


Where this route gets difficult
They run from the Lianyungang terminal through the voyage to Manila and the Philippines import file.
Lianyungang MSA's June 2025 guide for ESS on break-bulk ships treats ESS cabinets as UN3480 and ESS containers as UN3536, recommends a remaining charge of 20–50%, and requires converters and monitoring to be powered off, series and parallel circuits disconnected, packages evenly spread with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
PAGASA reports that about 20 tropical cyclones enter the Philippine Area of Responsibility each year, 8-9 of them crossing the islands. Ports such as Manila suspend operations when storm signals are raised, and inter-island feeder legs stop sailing, so a battery container can wait at a transhipment port as well as at Manila itself.
What Anxin does: In the typhoon months we ask the consignee to have its customs entry ready before arrival, so the container can leave Manila as soon as operations restart.
Trucks over 4,500 kg are banned from Metro Manila roads from 6 to 10 am and 5 to 10 pm except on Sundays and holidays; only essential goods have been exempt since March 2026. A battery container leaving Manila has to be moved inside the open windows.
What Anxin does: We ask the consignee's trucker to plan the pick-up from Manila around the truck-ban hours, so the release and the truck slot line up.
A DTI draft technical regulation published in February 2026 would bring power banks under mandatory PS or ICC marking, with a 12-month transition. Importers of power banks through Manila should follow its progress so that stock arriving after the transition is covered.
What Anxin does: For power bank orders we ask the importer whether it has started on PS or ICC marking, so later shipments are not caught at the end of the transition.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Lianyungang filings, the carrier booking and the Philippines import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
Questions
Only after registering in the Bureau of Customs' CPRS and being accredited.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Manila before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Philippines ports

Share the cargo facts; we review the route in writing.
Request a Quote