Ningbo-Zhoushan (Beilun / Meishan)
Beilun and Meishan exports under Zhejiang MSA's January 2026 battery guide, which trims duplicate filings but not the carrier's own document checks.
South & Southeast Asia · sea freight from Ningbo
Ningbo to Mundra
East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean
From Ningbo to Mundra, cargo moves through Ningbo-Zhoushan, crosses the Indian Ocean monsoon corridor, and is discharged at the port of Mundra.
In India the BIS R-number must match the manufacturer, model and factory on crsbis.in. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Beilun and Meishan exports under Zhejiang MSA's January 2026 battery guide, which trims duplicate filings but not the carrier's own document checks.
BIS registration verified model by model, EPR registration for importers, and a Bill of Entry due before the ship arrives.


Where this route gets difficult
They run from the Ningbo terminal through the voyage to Mundra and the India import file.
Since Zhejiang MSA's January 2026 battery guide, a Ningbo shipper no longer attaches the UN38.3 test summary at the MSA cargo-report stage (the carrier receives it instead) and does not resubmit the safety data sheet for an unchanged maker, owner and model. Carriers must still review the documents and turn away batteries that fail the ship-carriage standard JT/T 1543-2025.
What Anxin does: We send the UN38.3 summary and SDS to the carrier with the booking request, and keep a per-model file so repeat shipments use the SDS already on record.
Zhejiang MSA runs a 'one-document' rule for battery water-to-water transhipment: if the cargo report is made at the port of loading, only a ship report is needed at the transhipment port. Cargo barged into Ningbo can therefore avoid a second cargo report, provided the first one was filed correctly.
What Anxin does: When cargo starts on a feeder or barge, we make sure the cargo report is filed at the first port of loading and carries the ocean routing, so no second cargo report is needed at Ningbo.
Colombo handled a record 8.29 million TEU in 2025, about 81% of it transhipment, and roughly 45% of that transhipment is linked to Indian trade. A container for Mundra may well be discharged in Colombo and reloaded onto a feeder, so the DG declaration and the booking have to cover both vessels.
What Anxin does: We ask the carrier at booking whether the service to Mundra relays in Colombo or elsewhere, and check that the DG acceptance covers the feeder leg too.
India requires an IEC for imports, issued by DGFT and updated each year in April to June. For Mundra, the consignee's code should be checked before Ningbo loads.
What Anxin does: We ask the consignee for its IEC before we book the box from Ningbo to Mundra.
India requires lithium-ion cells and batteries to be registered under BIS's CRS (IS 16046 Part 2) before import. The registration number is declared in the Bill of Entry, so a missing or wrong number stops the container at Mundra.
What Anxin does: Before booking we ask for the manufacturer's BIS R-number and check that it covers the models and factory named in the shipment.
Indian customs expect the Bill of Entry by the end of the day before the vessel arrives at Mundra; it can be filed up to 30 days ahead, and late filing attracts charges. The BIS and DG details must be ready by then.
What Anxin does: We send the importer's broker the invoice, packing list and BIS details as soon as the ship sails from Ningbo, so the Bill of Entry can be filed early.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Ningbo filings, the booking with the carrier and the documents for India before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Mundra.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Carrier rejects booking over UN38.3 / JT/T 1543-2025 documents | Ningbo booking stage | UN38.3 summary and SDS sent with the booking request | Shipper with Anxin |
| Late Bill of Entry charges | Indian port of discharge | Documents sent at sailing | Importer's broker |
Questions
They verify the registration on crsbis.in, including manufacturer, model and factory location, and refuse deferred or cancelled registrations.
The India Meteorological Department describes two North Indian Ocean seasons, April–May and October–December, the latter being the main one.
Yes. Zhejiang MSA's 2026 guide removed it from the MSA cargo-report stage, but it still has to go to the carrier, which must refuse batteries that do not meet JT/T 1543-2025.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Ningbo → Mundra before any booking, and ask for missing battery documents first.
All destinations from Ningbo · India ports

Share the cargo facts; we review the route in writing.
Request a Quote