Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Northeast Asia · sea freight from Qingdao

Shipping from Qingdao to Nagoya

Qingdao to Nagoya

Yellow Sea · East China Sea

Sea corridor illustration: Qingdao to Nagoya, Japan Simplified map with a curved corridor from Qingdao via Yellow Sea, East China Sea to Nagoya. Illustration only; not a vessel track or schedule. JAPANKOREA Yellow SeaEast China Sea QingdaoCHINA ORIGIN NagoyaJAPAN
  1. QingdaoChina origin
  2. Yellow Sea
  3. East China Sea
  4. NagoyaJapan
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs out of Qingdao on the Yellow Sea, where April to July is fog season, then follows an intra-Asia passage with no canal or chokepoint; at the far end is the port of Nagoya.

On the Japanese side the bills of lading are filed before departure and the batteries must be PSE-marked. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Qianwan export
  • One-document pilot
  • Port captain
  • PSE importer
  • NACCS 24-hour rule

Route profile

How Qingdao → Nagoya differs from other lanes

Origin port

Qingdao (Qianwan)

Qianwan exports from Shandong, where Qingdao MSA's one-document pilot cuts repeat filings for cargo moved between terminals by water.

Import country

Japan

Japan wants the cargo data before the ship sails and a notified PSE supplier behind the batteries.

Aerial view over Qingdao's harbour front, with piers and the Dagang port area
A loaded container ship on the horizon

Where this route gets difficult

Where Qingdao → Nagoya shipments get held up: 6 points

They run from the Qingdao terminal through the voyage to Nagoya and the Japan import file.

  1. Origin port

    One filing for transhipment between Qingdao terminals

    Qingdao MSA's 'one-document, one-box' pilot has since November 2024 covered water-to-water transhipment of lithium batteries and other 'new three' cargo between Dagang and Qianwan, with one outbound cargo report and no more than one packing inspection within the pilot ports. In the launch case, three cargo and three ship reports became one cargo and two ship reports.

    What Anxin does: If your cargo is stuffed at a Dagang yard or reaches Qianwan by water, we check at booking whether it qualifies for the pilot and file once, so the box is not reopened between terminals.

  2. Origin port

    Qingdao fog, April to July

    The China Meteorological Administration lists sea fog among the major marine hazards of the Yellow and Bohai Seas, mostly between April and July and with a serious effect on shipping. At Qingdao a fog hold can shift a battery container onto another vessel, and its DG filings must follow.

    What Anxin does: In fog season we leave slack between stuffing and the DG cut-off at Qianwan and keep the cargo report ready to amend quickly if the vessel changes.

  3. Sea corridor

    Typhoon season sets the short-sea schedule

    The Japan Meteorological Agency counts an average of 25.1 typhoons a year in the western North Pacific, with the most in August and September. On a short route the voyage is quick, but a storm can close the loading or discharge port for days, and the DG filings follow the box to whichever vessel it ends up on.

    What Anxin does: For July–October sailings to Nagoya we confirm the DG cut-off a week ahead and refile promptly if the vessel changes.

  4. Import country

    Collection duties for mobile batteries from April 2026

    From 1 April 2026 the amended Resource Effective Utilization Act made mobile batteries, mobile phones and heated-tobacco devices designated recycling products, which manufacturers and importers must collect and recycle against collection targets. Sealed lithium storage batteries were already covered, with JBRC running joint collection.

    What Anxin does: For consumer batteries and devices to Nagoya we ask the importer how it meets its collection duty, for example through JBRC, before the first order.

  5. Import country

    A ransomware attack once stopped every Nagoya terminal

    On 4 July 2023 ransomware stopped NUTS, the unified terminal system at Nagoya, and with it work at all of the port's container terminals until 18:15 on 6 July. It showed how much a container at Nagoya depends on the terminal system, not only on the ship.

    What Anxin does: We keep the container number, booking and DG documents with the consignee as well as the carrier, so pick-up can be rearranged quickly if terminal systems go down.

  6. Import country

    Nagoya is an International Hub Port

    MLIT classifies Nagoya as an International Hub Port . For a lithium battery box from Qingdao, the terminal at Nagoya and the carrier's DG acceptance should be confirmed before booking.

    What Anxin does: We confirm Nagoya's terminal and DG notice requirements for the Qingdao box with the carrier.

Locator map of Nagoya, JapanNagoya
Locator map in the same projection as the corridor map; the dot marks the listed port position (35.07°N, 136.87°E).
Stacked containers at a Busan port container yard at dusk

Documents & compliance

Documents to line up for Qingdao → Nagoya

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Before loading in Qingdao

  • Confirmation whether the Dagang–Qianwan one-document pilot applies; a single cargo report filed at the first port of loading
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable

Carrier and voyage

  • House B/L data sent in time for the NACCS pre-departure filing
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)

For import into Japan

  • Importer of record matches the PSE notification holder
A cylindrical lithium-ion cell held between two fingers
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Qingdao export filings, the carrier booking and the Japan import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risks on this route and who deals with them

RiskWhereMitigationWho acts
Duplicate filing or reopening between Qingdao terminalsDagang → QianwanPilot eligibility checked at booking; single cargo reportAnxin with the declarant
Fog hold forces a vessel change after filingQingdao, Apr–JulSlack in schedule; amendment-ready filingAnxin with the declarant
Typhoon closes a port; box moves to another vesselWestern North Pacific, Jul–OctDG cut-off confirmed; prompt refilingAnxin with the declarant

Questions

Common questions on the Qingdao → Nagoya route

The Japanese business that imports them. It notifies METI within 30 days of starting the business, inspects the batteries and applies the PSE mark with its name; a customs agent alone does not count.

Typhoons occur all year in the western North Pacific, but most in August and September: the Japan Meteorological Agency's 1991–2020 averages are 5.7 and 5.0 typhoons in those months.

Mainly April to July, according to the China Meteorological Administration, which calls sea fog a major hazard for Yellow Sea transport.

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Qingdao
  5. 5ImportClearance at Nagoya
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Qingdao → Nagoya

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Qingdao → Nagoya before any booking, and ask for missing battery documents first.

All destinations from Qingdao · Japan ports

Workers loading cartons from pallets by hand in a warehouse

Need Qingdao → Nagoya reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp