Asia – Americas via the Panama Canal
Gatun Lake levels set how much a ship can load through Panama; the Caribbean leg then crosses hurricane waters from June to November.
Latin America & Caribbean · sea freight from Shanghai
Shanghai to Manzanillo
East China Sea · Korea Strait · Sea of Japan · Tsugaru Strait · North Pacific · Eastern Pacific · Panama Canal
From Shanghai to Manzanillo, cargo moves out of Shanghai, crosses a Pacific crossing and a Panama Canal transit, and is discharged at the port of Manzanillo.
Panama requires a licensed customs broker who vouches for the documents. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
Gatun Lake levels set how much a ship can load through Panama; the Caribbean leg then crosses hurricane waters from June to November.
A licensed customs broker declares for the importer and vouches for the documents.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Manzanillo and at customs in Panama.
At Shanghai the packing inspector must upload photos taken before, during and after stuffing through the MSA's remote system, with face recognition and phone location on, before the electronic packing certificate goes out by EDI. A container is not loaded if the photos are missing, uploaded late, taken outside the verified stuffing site, or do not match the EDI cargo data. Stuffing sites outside Shanghai must be registered with Shanghai MSA.
What Anxin does: We confirm that the stuffing site (including factory sites in Jiangsu or Zhejiang) is registered for Shanghai's remote system, and we check the photo upload against the EDI data before the packing certificate is sent.
Shanghai MSA's 2024 draft reporting guide says warehouses that stuff lithium battery dangerous goods must provide fire-department proof of their fire hazard classification and fire-resistance rating. The site's information must also be up to date on the Shanghai single window, which took over MSA account and site records in 2026.
What Anxin does: We only propose stuffing sites that can show the fire-safety documents and are on Shanghai MSA's system; if you use your own warehouse, we check this before booking.
The Panama Canal Authority sets the maximum draft in the Neopanamax locks according to Gatun Lake levels. In September 2026 it postponed a planned cut from 14.63 m to 14.48 m that was due on 1 October (advisory A-33-2026). A lower limit means ships transiting the new locks can load less.
What Anxin does: We check the canal advisory in force when we quote for Manzanillo and ask carriers to confirm that the booked vessel's routing and any canal surcharge will not change before sailing.
In Panama the licensed broker alone acts for third parties before customs. For a container landing at Manzanillo, the importer's broker has to be known before the shipment leaves Shanghai.
What Anxin does: We ask the consignee for the name of its customs broker for Manzanillo before the booking from Shanghai is made.
In 2025 Manzanillo International Terminal moved 2,861,352 TEU, the most of any Panamanian terminal. A box for Manzanillo can be discharged for the Colón side or moved on to another carrier, so each stage has to accept the battery class.
What Anxin does: We ask the carrier whether the box from Shanghai is discharged or transferred at the terminal and confirm acceptance for each stage.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Shanghai export filings, the carrier booking and the Panama import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Container refused for loading: photos late, off-site or not matching EDI data | Yangshan / Waigaoqiao | Photo upload checked against EDI data before the certificate is sent | Packing inspector, checked by Anxin |
| Draft cut reduces capacity or adds surcharges | Panama Canal | Advisory checked at quotation; carrier confirmation | Carrier, checked by Anxin |
Questions
The information in the declaration and the consignee's documents behind it, including the tariff position.
It can. In September 2026 the Panama Canal Authority postponed a planned draft cut in the Neopanamax locks because of Gatun Lake levels (advisory A-33-2026). We check the advisory in force when quoting.
It can, but Shanghai MSA checks the phone location of the packing photos against a verified stuffing site, and sites outside Shanghai must be registered with it. We confirm registration before the stuffing date; otherwise the container can be refused for loading.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shanghai → Manzanillo before any booking, and ask for missing battery documents first.
All destinations from Shanghai · Panama ports

Share the cargo facts; we review the route in writing.
Request a Quote