Asia – Southeast Asian seas
No canal on this route, but two seasons to plan around: typhoons in summer and autumn and the north-east monsoon from November to March.
South & Southeast Asia · sea freight from Shanghai
Shanghai to Subic
East China Sea · Taiwan Strait · South China Sea
This route runs out of Shanghai, where MSA spot-checks battery containers during and after filing, then follows a Southeast Asian sea passage with no canal on the way; at the far end is the port of Subic.
The Philippines adds an advance manifest due 24 or 48 hours before arrival. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
No canal on this route, but two seasons to plan around: typhoons in summer and autumn and the north-east monsoon from November to March.
For the Philippines, the manifest comes early and only accredited importers can lodge entries.


Where this route gets difficult
Loading port first, then the sea leg, then Subic and the Philippines market.
At Shanghai the packing inspector must upload photos taken before, during and after stuffing through the MSA's remote system, with face recognition and phone location on, before the electronic packing certificate goes out by EDI. A container is not loaded if the photos are missing, uploaded late, taken outside the verified stuffing site, or do not match the EDI cargo data. Stuffing sites outside Shanghai must be registered with Shanghai MSA.
What Anxin does: We confirm that the stuffing site (including factory sites in Jiangsu or Zhejiang) is registered for Shanghai's remote system, and we check the photo upload against the EDI data before the packing certificate is sent.
Shanghai MSA's 2024 draft reporting guide says warehouses that stuff lithium battery dangerous goods must provide fire-department proof of their fire hazard classification and fire-resistance rating. The site's information must also be up to date on the Shanghai single window, which took over MSA account and site records in 2026.
What Anxin does: We only propose stuffing sites that can show the fire-safety documents and are on Shanghai MSA's system; if you use your own warehouse, we check this before booking.
Routes from northern China to Subic go through the Taiwan Strait, whose funnel effect makes winds 1-2 Beaufort levels stronger than outside. In winter and spring the north-east monsoon brings force 7 or more on about two-thirds of days, which is hard on a load that has not been braced.
What Anxin does: We ask for blocking and bracing photos before the container is closed in Shanghai, checked against the CINS stuffing guidance for lithium batteries.
A DTI draft technical regulation published in February 2026 would bring power banks under mandatory PS or ICC marking, with a 12-month transition. Importers of power banks through Subic should follow its progress so that stock arriving after the transition is covered.
What Anxin does: For power bank orders we ask the importer whether it has started on PS or ICC marking, so later shipments are not caught at the end of the transition.
Under CAO 15-2020 the carrier's manifest reaches the Bureau of Customs 24 hours before arrival at Subic on voyages of 72 hours or less, or 48 hours before on longer ones; consolidated cargo has its own earlier deadlines. The DG description has to be settled before those cut-offs.
What Anxin does: We give the carrier or consolidator the final cargo and DG data before sailing from Shanghai, so the Philippine manifest is filed complete.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Shanghai filings, the booking with the carrier and the documents for Philippines before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Subic.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Container refused for loading: photos late, off-site or not matching EDI data | Yangshan / Waigaoqiao | Photo upload checked against EDI data before the certificate is sent | Packing inspector, checked by Anxin |
Questions
Twenty-four hours before arrival for voyages of 72 hours or less, 48 hours for longer ones, under CAO 15-2020.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
It can, but Shanghai MSA checks the phone location of the packing photos against a verified stuffing site, and sites outside Shanghai must be registered with it. We confirm registration before the stuffing date; otherwise the container can be refused for loading.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shanghai → Subic before any booking, and ask for missing battery documents first.
All destinations from Shanghai · Philippines ports

Share the cargo facts; we review the route in writing.
Request a Quote