Asia – East Coast South America via the Cape of Good Hope
Two oceans and the Cape of Good Hope: one of the longest lanes on the site, crossing the waters where about a third of 2024's lost containers went overboard.
Latin America & Caribbean · sea freight from Shenzhen
Shenzhen to Itajai
South China Sea · Malacca Strait · Andaman Sea · Indian Ocean · Cape of Good Hope · South Atlantic
From Shenzhen to Itajai, cargo moves from factories around the Pearl River Delta through Yantian or Shekou, crosses one of the longest corridors on the site, via Malacca, the Cape and the South Atlantic, and is discharged at the port of Itajai.
On the Brazilian side the risk sits in licences and registrations that must match the goods description word for word. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Two oceans and the Cape of Good Hope: one of the longest lanes on the site, crossing the waters where about a third of 2024's lost containers went overboard.
Import licensing through LPCO before the Duimp, product-specific certification (Anatel for phone batteries), Ibama registration without Ibama licensing, and Portuguese consumer information.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Itajai and at customs in Brazil.
Dongguan, home to more than 500 battery companies, supplies much of the cargo leaving Shenzhen. Since September 2026 Dongguan Customs and Dongguan MSA share dangerous-goods packaging certificate data, described as a first in China, and act jointly against concealed and false declarations; the one-box route to Yantian, 409 containers by then, relies on the same record.
What Anxin does: We compare the packaging certificate with the MSA cargo report (UN number, packaging code, number of packages) before either goes in, so the shared data shows no gap.
June to October is the regional tropical cyclone season according to the Hong Kong Observatory, peaking July to September. Because DG boxes need approved MSA filings and a signed packing certificate before loading, a gate closure or rolled vessel in those weeks can move the entire document chain to another sailing.
What Anxin does: From June to October we build slack into the stuffing date, confirm the DG cut-off with the carrier the week before loading, and resubmit filings promptly if the vessel changes.
The drawn corridor from Shenzhen rounds the Cape of Good Hope and then crosses the South Atlantic to Itajai. The Cape section is where, according to the South African Maritime Safety Authority, about 200 of the 576 containers lost worldwide in 2024 went overboard. A long passage through open ocean is also more time for a poorly braced load to work loose.
What Anxin does: We apply the CINS stuffing checks (30 cm clearances, no free gaps, packages off the walls) on photos before the container is sealed, and ask the carrier to name any transhipment port on the booking.
The Itajaí complex moved 1.43 million TEU in 2025 across the public Porto de Itajaí and Portonave in Navegantes. A box booked to Itajai may be discharged at either, so the consignee needs the terminal the carrier names.
What Anxin does: We ask the carrier for the discharge terminal for Itajai and give it to the consignee's broker.
ANTAQ consulted on the lease of area ITJ01 at Itajaí in 2026. For Itajai, the receiving terminal for the Shenzhen cargo should be confirmed with the carrier.
What Anxin does: We ask the carrier which terminal in the Itajaí complex will receive the box from Shenzhen.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Shenzhen filings, the carrier booking and the Brazil import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Typhoon closes terminals or delays the vessel after filings are made | Yantian / Shekou, Jun–Oct | Slack in stuffing date; refile quickly on vessel change | Anxin with the declarant |
| Packaging certificate and MSA filing disagree; shipment flagged | Dongguan → Yantian | Line-by-line comparison before filing | Anxin with the declarant |
| Cargo shifts during the Cape and South Atlantic legs | Cape of Good Hope / South Atlantic | Blocking and bracing checked on stuffing photos before sealing | Packing site, checked by Anxin |
Questions
Normally before the import declaration (DI or Duimp) is registered, and in some cases before the goods ship. Because the licence text must match the NCM description, we align our shipping documents with it rather than the other way round.
Since September 2026 Dongguan Customs and Dongguan MSA share dangerous-goods packaging certificate data and act jointly against false declarations, so the packaging certificate and the MSA filing should match exactly.
The 30% ceiling is an air-transport rule (IATA PI 965 for lithium-ion batteries shipped alone). The sea guidance we rely on sets no general 30% cap for UN3480 or UN3481, but a carrier may set its own condition, so we confirm it at booking.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shenzhen → Itajai before any booking, and ask for missing battery documents first.
All destinations from Shenzhen · Brazil ports

Share the cargo facts; we review the route in writing.
Request a Quote