Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Africa · sea freight from Tianjin

Shipping from Tianjin to Port Réunion

Tianjin to Port Réunion

Bohai Sea · Bohai Strait · Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea

Sea corridor illustration: Tianjin to Port Réunion, Réunion Simplified map with a curved corridor from Tianjin via Bohai Sea, Bohai Strait, Yellow Sea, East China Sea, Taiwan Strait, South China Sea, Malacca Strait, Andaman Sea to Port Réunion. Illustration only; not a vessel track or schedule. CHINAINDIASOUTHEAST ASIAAUSTRALIAAFRICANORTH PACIFICPACIFIC OCEAN Taiwan StraitSingapore / Malacca TianjinCHINA ORIGIN Port RéunionRÉUNION TianjinBOHAI SEAYELLOW SEASHANDONGDEPARTURE AREA
  1. TianjinChina origin
  2. Bohai Sea
  3. Bohai Strait
  4. Yellow Sea
  5. East China Sea
  6. Taiwan Strait
  7. South China Sea
  8. Malacca Strait
  9. Andaman Sea
  10. Port RéunionRéunion
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

From Tianjin to Port Réunion, cargo moves out of Tianjin's Xingang terminals, crosses the Indian Ocean monsoon corridor, and is discharged at the port of Port Réunion.

In Réunion batteries are an EU import, with a regional tax on top. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Factory-supervised loading
  • Bohai Bay winter ice
  • EU declaration of conformity
  • EU customs territory
  • Octroi de mer

Route profile

What sets Tianjin → Port Réunion apart

Origin port

Tianjin (Xingang)

North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.

Sea corridor

Asia – Indian Ocean

After the Malacca Strait comes the Indian Ocean, where the south-west monsoon and two cyclone seasons decide the pace.

Container gantry cranes at a Tianjin port container terminal
A container ship under way off the Guatemalan coast

Where this route gets difficult

What to watch between Tianjin and Port Réunion: 6 points

Loading port first, then the sea leg, then Port Réunion and the Réunion market.

  1. Origin port

    Packaging appraisal comes first, even with Tianjin's quicker release

    China requires use appraisal of export dangerous-goods packaging before the goods may be exported. Tianjin port's 2025 facilitation measures shortened packaging appraisal time for lithium battery exports through quick release, and Tianjin Port Group provides port services for lithium DG containers, but the appraisal certificate is still a precondition for the rest of the filing.

    What Anxin does: We check at quotation that the packaging maker has its performance appraisal and apply for the use appraisal as soon as the packing is fixed, so the certificate is in hand before the MSA filing.

  2. Origin port

    A slow document review at Tianjin can mean a missed vessel

    Tianjin MSA itself said in July 2026 that, under the traditional review model, long document reviews often made firms miss the vessel's document cut-off, leaving cargo in port to be re-allocated to another ship. Its new fast-track green channel (appointment-based, more than 50% faster, with a fixed document list) is for new-energy-vehicle cargo; battery shipments should not assume they qualify.

    What Anxin does: We submit the cargo report with the full document set (safe-carriage declaration, SDS, packing certificate, packaging certificate) days before the cut-off rather than on the day, and treat any MSA query as same-day work.

  3. Sea corridor

    South-west Indian Ocean cyclones, November to April

    Météo-France La Réunion counted 11 named storms, 6 of them tropical cyclones, in the 2025–26 south-west Indian Ocean season (15 November to 30 April), an above-normal year in which Madagascar was hit twice. Sailings to Port Réunion in those months can meet port closures or diversions.

    What Anxin does: For November–April sailings we build slack into the delivery plan and track the carrier's revised arrival.

  4. Import country

    EU rules apply in Réunion

    Réunion is an outermost region of the EU and part of its customs territory, so the EU's product and customs rules apply to batteries landed at Port Réunion just as they do in mainland France.

    What Anxin does: We treat a shipment to Port Réunion as an EU import: CE documentation, Battery Regulation labelling and the ICS2 filing are checked before loading in Tianjin.

  5. Import country

    The ICS2 entry summary is due before loading in Tianjin

    Sea cargo for the EU needs a complete Entry Summary Declaration under ICS2 Release 3, and for deep-sea containers it is due 24 hours before loading at the departure port. Carriers apply 'no manifest, no load', and a filing without a valid EORI number is rejected, so a data gap in Tianjin leaves the box on the quay.

    What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Tianjin cut-off.

  6. Import country

    The importer's name and address on the battery

    The Battery Regulation asks the importer to put its own name, registered trade name or trade mark and postal address, with a single contact point, on the battery. Only when the battery's size or nature makes that impossible may the details move to the packaging or an accompanying document, so a Réunion importer's details need to reach the factory before printing.

    What Anxin does: We pass the Réunion importer's name and address block to the manufacturer before the goods are packed in China and check carton or battery photos for it before loading.

Locator map of Port Réunion, RéunionPort Réunion
Locator map in the same projection as the corridor map; the dot marks the listed port position (20.93°S, 55.32°E).
Container stacks and cranes at the Port of Mombasa

Documents & compliance

What to have ready: Tianjin to Port Réunion

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Before loading in Tianjin

  • Packaging use-appraisal certificate issued before the MSA cargo report is filed
  • EU declaration of conformity and CE marking photo from the manufacturer
  • Importer name, trade name and postal address printed on battery or packaging
  • Substance declaration covering mercury, cadmium and lead limits
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report

For the carrier and the voyage

  • Consignee EORI and HS-level description to the ENS filer before loading
  • UN 38.3 test summary for every cell and battery type
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)

At the Réunion end

  • HS code agreed so the importer can check the octroi de mer rate
  • Label and QR-code status against the August 2026 and February 2027 dates
An electric bicycle with its battery mounted on the frame
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Tianjin filings, the booking with the carrier and the documents for Réunion before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Port Réunion.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Tianjin to Port Réunion, and who acts

RiskWhereMitigationWho acts
Document review runs past the vessel cut-off; cargo re-allocated to a later shipTianjin MSA reviewComplete document set filed days before cut-offAnxin with the declarant
Cyclone closes the port or delays arrivalSouth-west Indian Ocean, Nov–AprSlack in delivery planCarrier / consignee
ENS not filed and the box is refused at loadingLoading port, TianjinEORI and house-bill data passed to the filer at bookingFiler (carrier / forwarder)
Importer details missing from battery and packagingImporter in RéunionAddress block sent to the factory before packingManufacturer / importer

Questions

Tianjin → Port Réunion: questions we are asked

Yes. Activity is suspended and the gantries are anchored; after Cyclone Belal in 2024 operations resumed within three days.

Yes. The south-west Indian Ocean season runs from mid-November to the end of April; Météo-France counted 11 named storms in 2025–26.

The green channel Tianjin MSA announced in July 2026 is for new-energy-vehicle cargo. For battery containers we plan on the normal review and file early, because Tianjin MSA has said long reviews under the traditional model often cost firms their vessel cut-off.

References

Official sources for this page

  1. Treaty on the Functioning of the European Union, Articles 349 and 355 (outermost regions) (EUR-Lex)
  2. Regulation (EU) No 952/2013 laying down the Union Customs Code (Article 4: customs territory) (EUR-Lex)
  3. L'octroi de mer à La Réunion (Direction Générale des Douanes et Droits Indirects)
  4. Réorganisation et sécurisation du port Est (Grand Port Maritime de La Réunion)
  5. Rapport d'activités 2024 (Grand Port Maritime de La Réunion)
  6. Regulation (EU) 2023/1542 on batteries and waste batteries (ELI) (EUR-Lex / Publications Office of the EU)
  7. ICS2 Release 3: Prepare your business for sending goods to or via the EU by sea and inland waterways (European Commission, DG TAXUD (leaflet KP0423828ENN))
  8. Regulation (EU) 2023/1542 concerning batteries and waste batteries (Official Journal PDF) (EUR-Lex / Publications Office of the EU)
  9. 2025–2026 south-west Indian Ocean cyclone season review (Météo-France La Réunion)
  10. Tianjin MSA opens a green channel for new-energy-vehicle shipments (Tianjin Economic-Technological Development Area (TEDA) Administration)
  11. Tianjin port 2025 cross-border trade facilitation measures (Tianjin Municipal Government (tjjz.gov.cn))
  12. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Tianjin
  5. 5ImportClearance at Port Réunion
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Tianjin → Port Réunion

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Tianjin → Port Réunion before any booking, and ask for missing battery documents first.

All destinations from Tianjin · Réunion ports

Trailers backed up to the loading docks of a warehouse

Need Tianjin → Port Réunion reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp