Xiamen (Haicang / Songyu)
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
South & Southeast Asia · sea freight from Xiamen
Xiamen to Kuching
South China Sea
From Xiamen to Kuching, cargo moves out of Xiamen's Haicang and Songyu terminals on the Taiwan Strait, crosses Southeast Asian waters, with their typhoon and monsoon seasons, and is discharged at the port of Kuching.
In Malaysia vehicle batteries need an Approved Permit and chargers an Energy Commission approval. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Kuching and at customs in Malaysia.
Leaving Xiamen, ships are in the Taiwan Strait at once. A Chinese government weather account says the strait's funnel effect adds 1–2 Beaufort levels to the wind, and that the north-east monsoon of winter and spring brings force 7 or more on about two days in three. Lashing on container ships should be secured accordingly.
What Anxin does: From October to April we apply the CINS blocking and bracing checks strictly on stuffing photos before sealing.
Through the single window, Xiamen Customs now issues the lithium battery packaging use-appraisal certificate after automatic pre-review matching: roughly 10 minutes in a case reported in August 2026, compared with about half a day for the former on-site inspection. Only products that pass pre-review as compliant and valid get the fast path; mismatches return to inspection.
What Anxin does: We check the product data, UN38.3 summary and packaging codes against the application before it is submitted, so the certificate comes through pre-review rather than falling back to an on-site check.
MetMalaysia describes the north-east monsoon, usually November to March, as bringing heavy rain and rough seas off the east coast of Peninsular Malaysia, western Sarawak and eastern Sabah, with strong-wind and rough-sea warnings for the South China Sea. Routes to Kuching cross those waters in the season, and a rough crossing tests the stow.
What Anxin does: For winter sailings we pay particular attention to how battery cartons are stacked and secured, and ask the packing site for photos of each tier before the doors are closed.
Kuching handled 305,197 TEU in 2024, up from 274,202, almost all import and export cargo (Ministry of Transport Malaysia). A box from Xiamen for Kuching in Sarawak may be relayed via a larger hub, so the routing should be confirmed with the line.
What Anxin does: We confirm the routing of the box from Xiamen to Kuching with the carrier and share it with the consignee.
Adapters and chargers are among the 34 categories of regulated electrical equipment in Malaysia. Importing them needs a Certificate of Approval from the Energy Commission under regulation 97, and they must carry the label required by regulation 98, so a battery product shipped with its charger to Kuching needs both.
What Anxin does: When chargers or adapters are packed with the batteries, we ask the importer for the Certificate of Approval and check the label on product photos before loading in Xiamen.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Xiamen filings, the booking with the carrier and the documents for Malaysia before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Kuching.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Application fails pre-review and falls back to on-site inspection | Xiamen Customs | Data checked against the application first | Anxin with the manufacturer |
| Cargo shift in winter monsoon seas | Taiwan Strait, Oct–Apr | CINS blocking and bracing checked on photos | Packing site, checked by Anxin |
| Cargo shift in winter monsoon seas | Southern South China Sea, Nov-Mar | Checked stowage and bracing | Packing site, checked by Anxin |
Questions
Yes. Adapters and chargers are regulated equipment; the importer needs an Energy Commission Certificate of Approval and the required label.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
For products that pass automatic pre-review, Xiamen Customs issues it through the single window; the case reported in August 2026 took about 10 minutes, against about half a day for the old on-site inspection. Products that do not pass pre-review still need inspection.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Xiamen → Kuching before any booking, and ask for missing battery documents first.
All destinations from Xiamen · Malaysia ports

Share the cargo facts; we review the route in writing.
Request a Quote