Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Europe · sea freight from Dalian
Dalian to Sesimbra
Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Sicily Channel · Strait of Gibraltar
From Dalian to Sesimbra, cargo moves from Liaoning through Dalian's Dayaowan terminals, crosses a Bab el-Mandeb and Suez passage into the Mediterranean, and is discharged at the port of Sesimbra.
The Portuguese side adds SILiAmb registration to the EU battery rules. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
An annual SILiAmb declaration, a licensed management entity or individual system, and EU importer duties from the declaration of conformity to the importer's address on the battery.


Where this route gets difficult
Loading port first, then the sea leg, then Sesimbra and the Portugal market.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
The 43% of Mediterranean services not using the Red Sea sail round the Cape of Good Hope, then back through Gibraltar. SAMSA estimates about 200 of the 576 containers lost at sea in 2024 went overboard near the Cape, 35% of the year's total.
What Anxin does: On Cape sailings we apply the CINS blocking and bracing checks strictly on stuffing photos before sealing.
Two marking dates fall into current shipping plans for Portugal: the general label from 18 August 2026 and the QR code from 18 February 2027, which for EV, LMT and larger industrial batteries has to open the battery passport.
What Anxin does: Before booking we ask the Portugal importer to confirm the battery category and whether the label and QR-code elements are already on the goods, and compare carton photos with that answer.
Article 11 of the Battery Regulation says that from 18 February 2027 portable batteries inside appliances must be readily removable and replaceable by the end-user using commercially available tools, without heat or solvents, except under limited derogations. Appliances sold in Portugal after that date need a design that complies.
What Anxin does: When appliances with built-in batteries are booked for Portugal we point the importer to the February 2027 date so the manufacturer answers the design question before shipment; we do not assess compliance.
Annex I of the Battery Regulation caps mercury at 0.0005 %, cadmium at 0.002 % and lead at 0.01 % by weight in portable batteries, and the lead limit has applied since 18 August 2024. Market surveillance in Portugal can ask the importer to show that the goods meet these limits.
What Anxin does: We ask the manufacturer for its substance declaration or test report reference and file it with the shipping documents for the Portugal importer; we do not test batteries.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Portugal import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Heavy weather off South Africa on a Cape sailing | Cape of Good Hope | CINS stuffing checks | Packing site, checked by Anxin |
| Stock shipped without the label due from August 2026 | Importer in Portugal | Label status confirmed before booking | Manufacturer / importer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Portugal requires. Both have applied since 18 August 2024.
Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Sesimbra before any booking, and ask for missing battery documents first.
All destinations from Dalian · Portugal ports

Share the cargo facts; we review the route in writing.
Request a Quote