Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
Europe · sea freight from Lianyungang
Lianyungang to Bremen
Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel
This route runs through Lianyungang port, then follows a voyage that may run through Suez as drawn or round the Cape, depending on the service; at the far end is the port of Bremen.
Germany expects the battery to be registered, labelled and pre-declared before it is loaded in China. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
EU Battery Regulation labelling and QR-code dates, stiftung ear registration under the BattDG, and an ICS2 entry summary that must exist before the box is loaded.


Where this route gets difficult
Loading port first, then the sea leg, then Bremen and the Germany market.
Lianyungang MSA's Notice No. 1 of 2024 cut the materials for 'new three' cargo to four on the cargo side: the safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where packaged, and a power of attorney. Fewer papers means each one carries more weight; the packing certificate still has to be signed by a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
The corridor on this page is drawn through Bab-el-Mandeb and the Suez Canal. In practice, Sea-Intelligence data for September 2026 put Red Sea routing on the Asia–Europe head-haul at 13–25%: 27% for services to North Europe and 57% for Mediterranean services. Which service calls at Bremen decides whether the box goes through Suez or round the Cape of Good Hope, and the two routings differ in length, in the waters crossed and in the ports where a box might be transhipped.
What Anxin does: We ask the carrier to state the routing and any transhipment port on the booking confirmation, and we quote the two routings separately when both are on offer rather than mixing them.
Stationary battery energy storage systems placed on the EU market since 18 August 2024 must be safe in normal operation, with technical documentation showing tests against the Annex V parameters, including thermal shock, short-circuit protection, over-discharge and thermal propagation. ESS buyers in Germany increasingly ask for that file before delivery.
What Anxin does: For ESS cabinets and racks bound for Germany we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.
The importer in Germany carries the check: CE marking on the battery and an EU declaration of conformity, translated into the language Germany asks for, have both been required since 18 August 2024 for batteries entering the EU market.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Germany importer. We check that the documents exist and match the goods; we do not assess conformity.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the Germany import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Service switches between Suez and Cape routing | Main voyage | Routing written on the booking; quotes kept separate per routing; packing assumes the longer voyage | Carrier, tracked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Germany | Declaration and CE photo collected before loading | Manufacturer / importer |
| Storage system delivered without Annex V test file | Buyer in Germany | Test documentation confirmed before booking | Manufacturer |
Questions
The registration is needed before the batteries are first made available on the German market, by whoever is the producer for that market. A company without a German establishment has to act through one authorised representative in Germany, and since 2026 each battery category must also be covered by an approved OfH. Shipping can start earlier, but goods without a valid registration cannot be sold in Germany once they arrive, so we ask for the registration number at booking.
Ships of 5,000 GT and above calling at EU ports are in the EU Emissions Trading System, covering 50% of the emissions of a voyage from outside the EU. Lines must surrender allowances for 70% of 2025 emissions and 100% from 2027, and may pass the cost on as a surcharge.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Bremen before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Germany ports

Share the cargo facts; we review the route in writing.
Request a Quote