Lithium battery freight focus Air · Sea · Land assessment Document-first planning
Shipment Status & Support

Europe · sea freight from Lianyungang

Shipping from Lianyungang to Bremen

Lianyungang to Bremen

Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel

Sea corridor illustration: Lianyungang to Bremen, Germany Simplified map with a curved corridor from Lianyungang via Yellow Sea, Taiwan Strait, Malacca Strait, Indian Ocean, Bab-el-Mandeb, Suez Canal, Strait of Gibraltar, English Channel to Bremen. Illustration only; not a vessel track or schedule. CHINAINDIAAFRICAEUROPECENTRAL ASIA Singapore / MalaccaBab-el-MandebSuez CanalGibraltarEnglish Channel LianyungangCHINA ORIGIN BremenGERMANY LianyungangYELLOW SEASHANDONGJIANGSUDEPARTURE AREA
  1. LianyungangChina origin
  2. Yellow Sea
  3. Taiwan Strait
  4. Malacca Strait
  5. Indian Ocean
  6. Bab-el-Mandeb
  7. Suez Canal
  8. Strait of Gibraltar
  9. English Channel
  10. BremenGermany
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs through Lianyungang port, then follows a voyage that may run through Suez as drawn or round the Cape, depending on the service; at the far end is the port of Bremen.

Germany expects the battery to be registered, labelled and pre-declared before it is loaded in China. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Lianyungang export
  • Break-bulk ESS guide
  • EU declaration of conformity
  • Consignee EORI
  • Batt-Reg.-Nr. DE

Route profile

How Lianyungang → Bremen differs from other lanes

Origin port

Lianyungang

Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.

Import country

Germany

EU Battery Regulation labelling and QR-code dates, stiftung ear registration under the BattDG, and an ICS2 entry summary that must exist before the box is loaded.

Aerial view over the Port of Lianyungang with berths, rail lines and cargo yards
A container ship under way off the Guatemalan coast

Where this route gets difficult

What to watch between Lianyungang and Bremen: 5 points

Loading port first, then the sea leg, then Bremen and the Germany market.

  1. Origin port

    A shorter document list at Lianyungang, not a shorter check

    Lianyungang MSA's Notice No. 1 of 2024 cut the materials for 'new three' cargo to four on the cargo side: the safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where packaged, and a power of attorney. Fewer papers means each one carries more weight; the packing certificate still has to be signed by a certified inspector after supervised stuffing.

    What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.

  2. Origin port

    Yellow Sea fog from April to July

    The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.

    What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.

  3. Sea corridor

    Suez on the map, the Cape on most sailings

    The corridor on this page is drawn through Bab-el-Mandeb and the Suez Canal. In practice, Sea-Intelligence data for September 2026 put Red Sea routing on the Asia–Europe head-haul at 13–25%: 27% for services to North Europe and 57% for Mediterranean services. Which service calls at Bremen decides whether the box goes through Suez or round the Cape of Good Hope, and the two routings differ in length, in the waters crossed and in the ports where a box might be transhipped.

    What Anxin does: We ask the carrier to state the routing and any transhipment port on the booking confirmation, and we quote the two routings separately when both are on offer rather than mixing them.

  4. Import country

    Annex V testing for stationary energy storage

    Stationary battery energy storage systems placed on the EU market since 18 August 2024 must be safe in normal operation, with technical documentation showing tests against the Annex V parameters, including thermal shock, short-circuit protection, over-discharge and thermal propagation. ESS buyers in Germany increasingly ask for that file before delivery.

    What Anxin does: For ESS cabinets and racks bound for Germany we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.

  5. Import country

    CE marking and a declaration of conformity in the right language

    The importer in Germany carries the check: CE marking on the battery and an EU declaration of conformity, translated into the language Germany asks for, have both been required since 18 August 2024 for batteries entering the EU market.

    What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Germany importer. We check that the documents exist and match the goods; we do not assess conformity.

Locator map of Bremen, GermanyBremen
Locator map in the same projection as the corridor map; the dot marks the listed port position (53.13°N, 8.77°E).
Container gantry cranes at the Burchardkai terminal in Hamburg

Documents & compliance

Checklist for Lianyungang → Bremen

Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

In Lianyungang, before the box is loaded

  • The four cargo-side documents under Lianyungang MSA Notice 2024 No. 1 prepared together and cross-checked
  • Importer name, trade name and postal address printed on battery or packaging
  • Annex V safety documentation confirmed for stationary storage systems
  • Substance declaration covering mercury, cadmium and lead limits
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report

Carrier and voyage

  • Routing (Suez or Cape of Good Hope) and any transhipment port stated on the booking confirmation
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)
  • UN 38.3 test summary for every cell and battery type

At the Germany end

  • Haulier in Germany briefed with UN number, class 9 and tunnel code (E) for the road leg
  • Consignee EORI number and the party filing the ICS2 entry summary
An electric scooter parked by a wall
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the Germany import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Lianyungang to Bremen, and who acts

RiskWhereMitigationWho acts
One of the four documents inconsistent with the othersLianyungang MSA filingCross-check before submissionAnxin with the declarant
Service switches between Suez and Cape routingMain voyageRouting written on the booking; quotes kept separate per routing; packing assumes the longer voyageCarrier, tracked by Anxin
Declaration of conformity missing or not in the required languageImporter in GermanyDeclaration and CE photo collected before loadingManufacturer / importer
Storage system delivered without Annex V test fileBuyer in GermanyTest documentation confirmed before bookingManufacturer

Questions

Common questions on the Lianyungang → Bremen route

The registration is needed before the batteries are first made available on the German market, by whoever is the producer for that market. A company without a German establishment has to act through one authorised representative in Germany, and since 2026 each battery category must also be covered by an approved OfH. Shipping can start earlier, but goods without a valid registration cannot be sold in Germany once they arrive, so we ask for the registration number at booking.

Ships of 5,000 GT and above calling at EU ports are in the EU Emissions Trading System, covering 50% of the emissions of a voyage from outside the EU. Lines must surrender allowances for 70% of 2025 emissions and 100% from 2027, and may pass the cost on as a surcharge.

Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.

References

Regulations and port sources cited

  1. Regulation (EU) 2023/1542 on batteries and waste batteries (consolidated text) (EUR-Lex / Publications Office of the EU)
  2. Applying for a battery registration at stiftung ear (stiftung elektro-altgeräte register (stiftung ear))
  3. ICS2 Release 3: Prepare your business for sending goods to or via the EU by sea and inland waterways (European Commission, DG TAXUD (leaflet KP0423828ENN))
  4. Regulation (EU) 2023/1542 on batteries and waste batteries (ELI) (EUR-Lex / Publications Office of the EU)
  5. Regulation (EU) 2023/1542 concerning batteries and waste batteries (Official Journal PDF) (EUR-Lex / Publications Office of the EU)
  6. Inland transport of dangerous goods (summary of Directive 2008/68/EC) (EUR-Lex)
  7. Reducing emissions from the shipping sector (European Commission (DG Climate Action))
  8. Sea fog in the Yellow and Bohai Seas (fog season mainly April–July) (China Meteorological Administration (from Guangming Daily))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Lianyungang
  5. 5ImportClearance at Bremen
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Lianyungang → Bremen

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Lianyungang → Bremen before any booking, and ask for missing battery documents first.

All destinations from Lianyungang · Germany ports

A truck hauling a teal shipping container on a motorway

Need Lianyungang → Bremen reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp