Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
Europe · sea freight from Lianyungang
Lianyungang to Wismar
Yellow Sea · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel · Danish Straits
This route runs from northern Jiangsu through Lianyungang on the Yellow Sea, then follows a Suez-or-Cape voyage that ends with the Danish straits and the Baltic; at the far end is the port of Wismar.
Germany expects the battery to be registered, labelled and pre-declared before it is loaded in China. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
EU Battery Regulation labelling and QR-code dates, stiftung ear registration under the BattDG, and an ICS2 entry summary that must exist before the box is loaded.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Wismar and at customs in Germany.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
Ships of 5,000 GT and above calling at EU ports, Wismar included, are in the EU Emissions Trading System: 50% of the emissions of a voyage from China are covered, and the share of emissions for which lines must surrender allowances rises from 70% (for 2025 emissions) to 100% from 2027. Carriers can pass that cost on as a surcharge.
What Anxin does: We ask for the emissions surcharge to be shown as its own line in the quote, with the basis the carrier uses, so that successive quotes can be compared like for like.
Since 18 August 2024 a stationary battery energy storage system placed on the EU market must be safe in normal operation, and its technical documentation must show testing against the Annex V safety parameters, from thermal shock and short-circuit protection to over-discharge and thermal propagation. Buyers of ESS cabinets in Germany increasingly ask for that file before delivery.
What Anxin does: For ESS cabinets and racks bound for Germany we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.
Since 18 August 2024 a battery sold in the EU needs the CE marking and an EU declaration of conformity from its manufacturer. The declaration has to be available in the language Germany requires, and the importer is the one who must check both before the goods are released for sale.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Germany importer. We check that the documents exist and match the goods; we do not assess conformity.
The Battery Regulation asks the importer to put its own name, registered trade name or trade mark and postal address, with a single contact point, on the battery. Only when the battery's size or nature makes that impossible may the details move to the packaging or an accompanying document, so a Germany importer's details need to reach the factory before printing.
What Anxin does: We pass the Germany importer's name and address block to the manufacturer before the goods are packed in China and check carton or battery photos for it before loading.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the Germany import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| Emissions surcharge changes between quote and sailing | EU port call | Surcharge shown as a separate line | Carrier, checked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Germany | Declaration and CE photo collected before loading | Manufacturer / importer |
| Importer details missing from battery and packaging | Importer in Germany | Address block sent to the factory before packing | Manufacturer / importer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Germany requires. Both have applied since 18 August 2024.
Often, but it depends on the service. The Baltic is reached through the Danish straits, and we ask the carrier to name any transhipment port and confirm DG acceptance for each vessel.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Wismar before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Germany ports

Share the cargo facts; we review the route in writing.
Request a Quote