Asia – Mediterranean via Suez
Mediterranean services are the ones most likely to use Suez again (57% in September 2026), which puts the cargo back through Bab el-Mandeb, rated a SUBSTANTIAL threat.
Europe · sea freight from Lianyungang
Lianyungang to Volos
Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Mediterranean Sea · Aegean Sea
From Lianyungang to Volos, cargo moves from northern Jiangsu through Lianyungang on the Yellow Sea, crosses a Bab el-Mandeb and Suez passage into the Mediterranean, and is discharged at the port of Volos.
The Greek side adds EMPA registration to the EU battery rules. The 6 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
Mediterranean services are the ones most likely to use Suez again (57% in September 2026), which puts the cargo back through Bab el-Mandeb, rated a SUBSTANTIAL threat.
EMPA registration with EOAN before the first sale, a Greek authorised representative by written mandate, and the EU-wide battery and ICS2 duties.


Where this route gets difficult
They run from the Lianyungang terminal through the voyage to Volos and the Greece import file.
Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The 43% of Mediterranean services not using the Red Sea sail round the Cape of Good Hope, then back through Gibraltar. SAMSA estimates about 200 of the 576 containers lost at sea in 2024 went overboard near the Cape, 35% of the year's total.
What Anxin does: On Cape sailings we apply the CINS blocking and bracing checks strictly on stuffing photos before sealing.
Sea cargo for the EU needs a complete Entry Summary Declaration under ICS2 Release 3, and for deep-sea containers it is due 24 hours before loading at the departure port. Carriers apply 'no manifest, no load', and a filing without a valid EORI number is rejected, so a data gap in Lianyungang leaves the box on the quay.
What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Lianyungang cut-off.
Since 18 August 2024 a battery sold in the EU needs the CE marking and an EU declaration of conformity from its manufacturer. The declaration has to be available in the language Greece requires, and the importer is the one who must check both before the goods are released for sale.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Greece importer. We check that the documents exist and match the goods; we do not assess conformity.
Since 18 August 2024 a stationary battery energy storage system placed on the EU market must be safe in normal operation, and its technical documentation must show testing against the Annex V safety parameters, from thermal shock and short-circuit protection to over-discharge and thermal propagation. Buyers of ESS cabinets in Greece increasingly ask for that file before delivery.
What Anxin does: For ESS cabinets and racks bound for Greece we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Lianyungang filings, the carrier booking and the Greece import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Heavy weather off South Africa on a Cape sailing | Cape of Good Hope | CINS stuffing checks | Packing site, checked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Greece | Declaration and CE photo collected before loading | Manufacturer / importer |
| ENS not filed and the box is refused at loading | Loading port, Lianyungang | EORI and house-bill data passed to the filer at booking | Filer (carrier / forwarder) |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Greece requires. Both have applied since 18 August 2024.
Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Volos before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Greece ports

Share the cargo facts; we review the route in writing.
Request a Quote