Shanghai (Yangshan / Waigaoqiao)
Yangshan and Waigaoqiao exports under Shanghai MSA's photo-verified packing system, where a mismatch between photos and EDI data keeps a DG box off the ship.
Europe · sea freight from Shanghai
Shanghai to Ghent
East China Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel
Lithium batteries for Ghent go from the Yangtze River Delta via Shanghai's Yangshan and Waigaoqiao terminals. On the way they face a lane whose routing, Suez or Cape of Good Hope, is decided service by service, and they arrive at the port of Ghent.
Belgium expects the importer to be covered by Bebat or an approved individual plan. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Yangshan and Waigaoqiao exports under Shanghai MSA's photo-verified packing system, where a mismatch between photos and EDI data keeps a DG box off the ship.
Bebat membership or a regionally approved individual plan, an authorised representative for sellers without a Belgian base, and the EU-wide battery and ICS2 duties.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Ghent and at customs in Belgium.
Shanghai MSA's Notice No. 4 of 2024 accepts either an inspector-signed packing certificate or a packing declaration from the stuffing company, but places the burden on the shipper: the batteries must meet the UN tests and be protected against damage, short circuit and accidental activation, and MSA runs spot checks during and after the process, with proof to be produced on request.
What Anxin does: We keep a file per container (UN38.3 summary, SDS, packing photos, terminal protection details) so that proof can be produced the same day if Shanghai MSA asks for it after sailing.
Shanghai MSA's 2024 draft reporting guide says warehouses that stuff lithium battery dangerous goods must provide fire-department proof of their fire hazard classification and fire-resistance rating. The site's information must also be up to date on the Shanghai single window, which took over MSA account and site records in 2026.
What Anxin does: We only propose stuffing sites that can show the fire-safety documents and are on Shanghai MSA's system; if you use your own warehouse, we check this before booking.
The corridor on this page is drawn through Bab-el-Mandeb and the Suez Canal. In practice, Sea-Intelligence data for September 2026 put Red Sea routing on the Asia–Europe head-haul at 13–25%: 27% for services to North Europe and 57% for Mediterranean services. Which service calls at Ghent decides whether the box goes through Suez or round the Cape of Good Hope, and the two routings differ in length, in the waters crossed and in the ports where a box might be transhipped.
What Anxin does: We ask the carrier to state the routing and any transhipment port on the booking confirmation, and we quote the two routings separately when both are on offer rather than mixing them.
Stationary battery energy storage systems placed on the EU market since 18 August 2024 must be safe in normal operation, with technical documentation showing tests against the Annex V parameters, including thermal shock, short-circuit protection, over-discharge and thermal propagation. ESS buyers in Belgium increasingly ask for that file before delivery.
What Anxin does: For ESS cabinets and racks bound for Belgium we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.
The Battery Regulation's general information label applies from 18 August 2026 (or 18 months after the label implementing act, if later), and every battery needs a QR code from 18 February 2027, linked to a battery passport for EV, LMT and industrial batteries above 2 kWh. Where the battery is too small, both go on the packaging and accompanying documents.
What Anxin does: Before booking we ask the Belgium importer to confirm the battery category and whether the label and QR-code elements are already on the goods, and compare carton photos with that answer.
Regulation (EU) 2025/1561 pushed the Battery Regulation's due diligence duties for cobalt, lithium, nickel and natural graphite back to 18 August 2027 and gave the Commission until 26 July 2026 for its guidelines. Buyers in Belgium are already collecting the supply-chain information they will need.
What Anxin does: We pass the Belgium buyer's due diligence questions to the manufacturer and keep their answers with the shipment file; the policy itself remains the producer's responsibility.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Shanghai filings, the booking with the carrier and the documents for Belgium before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Ghent.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Post-event spot check finds missing proof | Shanghai MSA | Evidence file kept per container | Shipper with Anxin |
| Service switches between Suez and Cape routing | Main voyage | Routing written on the booking; quotes kept separate per routing; packing assumes the longer voyage | Carrier, tracked by Anxin |
| Stock shipped without the label due from August 2026 | Importer in Belgium | Label status confirmed before booking | Manufacturer / importer |
| Storage system delivered without Annex V test file | Buyer in Belgium | Test documentation confirmed before booking | Manufacturer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Belgium requires. Both have applied since 18 August 2024.
It depends on the service. In September 2026 most Asia–North Europe capacity still sailed round the Cape of Good Hope; Sea-Intelligence put the Red Sea share for North Europe vessels at 27%. We ask the carrier to confirm the routing on the booking and quote each routing separately.
Shanghai MSA's Notice No. 4 of 2024 accepts either an inspector-signed packing certificate or a packing declaration issued by the stuffing company. Either way, the shipper remains responsible and must provide proof if MSA spot-checks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shanghai → Ghent before any booking, and ask for missing battery documents first.
All destinations from Shanghai · Belgium ports

Share the cargo facts; we review the route in writing.
Request a Quote