Shanghai (Yangshan / Waigaoqiao)
Yangshan and Waigaoqiao exports under Shanghai MSA's photo-verified packing system, where a mismatch between photos and EDI data keeps a DG box off the ship.
Europe · sea freight from Shanghai
Shanghai to Aveiro
East China Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Sicily Channel · Strait of Gibraltar
Lithium batteries for Aveiro go out of Shanghai, where MSA spot-checks battery containers during and after filing. On the way they face a Bab el-Mandeb and Suez passage into the Mediterranean, and they arrive at the port of Aveiro.
Portugal adds its SILiAmb register to the EU Battery Regulation duties. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Yangshan and Waigaoqiao exports under Shanghai MSA's photo-verified packing system, where a mismatch between photos and EDI data keeps a DG box off the ship.
SILiAmb registration with APA and an annual declaration, a licensed management entity or approved individual system, and the EU-wide battery and ICS2 duties.


Where this route gets difficult
Loading port first, then the sea leg, then Aveiro and the Portugal market.
Under Shanghai MSA's 2024 draft reporting guide, a warehouse stuffing lithium battery dangerous goods must hold fire-department proof of its fire hazard class and fire-resistance rating, and keep its details current on the Shanghai single window, which took over MSA account and site records in 2026.
What Anxin does: We only propose stuffing sites that can show the fire-safety documents and are on Shanghai MSA's system; if you use your own warehouse, we check this before booking.
The JMIC's September 2026 update rated the northern Red Sea and Suez Canal MODERATE, with the canal operating in both directions and container lines returning selectively, and the Eastern Mediterranean LOW. The risk on this corridor is concentrated at the southern entrance of the Red Sea rather than at the canal.
What Anxin does: We check before each booking whether the service has changed routing since the last quote.
Importers placing batteries on the market in Portugal register with the Portuguese Environment Agency (APA) on SILiAmb and submit an annual declaration by 31 March that includes batteries built into other products. They meet their responsibility through a licensed management entity such as Electrão, or through an individual system authorised by APA.
What Anxin does: We ask the Portuguese importer for its APA registration and management entity before booking, and list battery weights separately so its declaration is easy.
The importer in Portugal carries the check: CE marking on the battery and an EU declaration of conformity, translated into the language Portugal asks for, have both been required since 18 August 2024 for batteries entering the EU market.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Portugal importer. We check that the documents exist and match the goods; we do not assess conformity.
Stationary battery energy storage systems placed on the EU market since 18 August 2024 must be safe in normal operation, with technical documentation showing tests against the Annex V parameters, including thermal shock, short-circuit protection, over-discharge and thermal propagation. ESS buyers in Portugal increasingly ask for that file before delivery.
What Anxin does: For ESS cabinets and racks bound for Portugal we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Shanghai filings, the carrier booking and the Portugal import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Importer not registered on SILiAmb | Importer in Portugal | Registration confirmed before booking | Importer |
| Declaration of conformity missing or not in the required language | Importer in Portugal | Declaration and CE photo collected before loading | Manufacturer / importer |
| Storage system delivered without Annex V test file | Buyer in Portugal | Test documentation confirmed before booking | Manufacturer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Portugal requires. Both have applied since 18 August 2024.
Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.
Shanghai MSA's Notice No. 4 of 2024 accepts either an inspector-signed packing certificate or a packing declaration issued by the stuffing company. Either way, the shipper remains responsible and must provide proof if MSA spot-checks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shanghai → Aveiro before any booking, and ask for missing battery documents first.
All destinations from Shanghai · Portugal ports

Share the cargo facts; we review the route in writing.
Request a Quote