Tianjin (Xingang)
North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.
Europe · sea freight from Tianjin
Tianjin to Wismar
Bohai Sea · Bohai Strait · Malacca Strait · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel · Danish Straits
Lithium batteries for Wismar go from North China through Tianjin Xingang. On the way they face a Suez-or-Cape voyage that ends with the Danish straits and the Baltic, and they arrive at the port of Wismar.
Germany expects the battery to be registered, labelled and pre-declared before it is loaded in China. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.
What we need to start
Route profile
North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.
EU Battery Regulation labelling and QR-code dates, stiftung ear registration under the BattDG, and an ICS2 entry summary that must exist before the box is loaded.


Where this route gets difficult
Listed from loading in Tianjin to import into Germany, each with what we do about it.
Under Tianjin Customs' 'supervised factory loading, direct loading on port arrival' model, officers supervise stuffing at the factory, the declaration is lodged early through the single window, and the box enters the port in a slot booked on the customs–port platform before going straight to the ship; inspections take place in closed yards at the Beijiang and Dongjiang terminals. The gain holds only if stuffing date, slot and declared data agree.
What Anxin does: We fix the stuffing date against the vessel's DG cut-off first, then book the entry slot, and check that the declaration, the packing certificate and the container number agree before the truck leaves, so the box is not diverted to an inspection yard for a data mismatch.
Ships of 5,000 GT and above calling at EU ports, Wismar included, are in the EU Emissions Trading System: 50% of the emissions of a voyage from China are covered, and the share of emissions for which lines must surrender allowances rises from 70% (for 2025 emissions) to 100% from 2027. Carriers can pass that cost on as a surcharge.
What Anxin does: We ask for the emissions surcharge to be shown as its own line in the quote, with the basis the carrier uses, so that successive quotes can be compared like for like.
Since 18 August 2024 a battery sold in the EU needs the CE marking and an EU declaration of conformity from its manufacturer. The declaration has to be available in the language Germany requires, and the importer is the one who must check both before the goods are released for sale.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Germany importer. We check that the documents exist and match the goods; we do not assess conformity.
From 18 February 2027, Article 11 requires portable batteries built into appliances to be readily removable and replaceable by the end-user with commercially available tools, without heat or solvents, apart from limited derogations. Appliances shipped to Germany for sale after that date need a design that meets the rule.
What Anxin does: When appliances with built-in batteries are booked for Germany we point the importer to the February 2027 date so the manufacturer answers the design question before shipment; we do not assess compliance.
The Battery Regulation's due diligence obligations on cobalt, lithium, nickel and natural graphite were postponed by Regulation (EU) 2025/1561 and now apply from 18 August 2027, with Commission guidelines due by 26 July 2026. Buyers in Germany are already asking suppliers for the supply-chain data they will need.
What Anxin does: We pass the Germany buyer's due diligence questions to the manufacturer and keep their answers with the shipment file; the policy itself remains the producer's responsibility.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

We line up UN numbers, model names and package counts across the Tianjin filings, the booking with the carrier and the documents for Germany before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Wismar.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Box sent to the terminal inspection yard because declared data do not match | Beijiang / Dongjiang terminals | Declaration, packing certificate and container number cross-checked before trucking | Anxin |
| Emissions surcharge changes between quote and sailing | EU port call | Surcharge shown as a separate line | Carrier, checked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Germany | Declaration and CE photo collected before loading | Manufacturer / importer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Germany requires. Both have applied since 18 August 2024.
Often, but it depends on the service. The Baltic is reached through the Danish straits, and we ask the carrier to name any transhipment port and confirm DG acceptance for each vessel.
Tianjin Customs offers a 'supervised factory loading, direct loading on port arrival' model: stuffing is supervised at the factory, the box enters the port in a booked slot and is loaded directly. Whether a given shipment can use it depends on the customs arrangement for the exporter and the port slot; we check both when you book.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Tianjin → Wismar before any booking, and ask for missing battery documents first.
All destinations from Tianjin · Germany ports

Share the cargo facts; we review the route in writing.
Request a Quote