Xiamen (Haicang / Songyu)
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
Europe · sea freight from Xiamen
Xiamen to Bremen
South China Sea · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Strait of Gibraltar · English Channel · Baltic Sea
This route runs from Fujian's battery makers through Xiamen port, then follows a voyage that may run through Suez as drawn or round the Cape, depending on the service; at the far end is the port of Bremen.
The German side adds producer registration with stiftung ear and the EU Battery Regulation's labelling calendar. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
EU Battery Regulation labelling and QR-code dates, stiftung ear registration under the BattDG, and an ICS2 entry summary that must exist before the box is loaded.


Where this route gets difficult
Listed from loading in Xiamen to import into Germany, each with what we do about it.
Xiamen Customs now issues the packaging use-appraisal certificate for lithium batteries through the single window after automatic pre-review matching: about 10 minutes in the case reported in August 2026, against roughly half a day for the old on-site inspection. The fast path is only for products that pass pre-review as compliant and valid; anything that does not match goes back to inspection.
What Anxin does: We check the product data, UN38.3 summary and packaging codes against the application before it is submitted, so the certificate comes through pre-review rather than falling back to an on-site check.
Xiamen MSA offers pre-review of key DG documents, a pre-loading meeting at which ship, cargo owner, terminal and agent agree deck stowage and emergency measures, and a 'one ship, one plan' checklist from gate-in to sailing. In June 2026 it reported 104 energy-storage containers of 36 tonnes each loaded for Houston on a multipurpose ship.
What Anxin does: We send the key documents for pre-review before the formal filing and bring the stowage and emergency details the meeting will ask for.
Routing round Africa takes battery boxes past the Cape. The World Shipping Council counted 576 containers lost at sea in 2024, and the South African Maritime Safety Authority estimates around 200 of them, about 35%, were lost near the Cape; in August 2024 SAMSA reported 99 boxes lost from the CMA CGM Belem off Richards Bay and 46 from the MSC Antonio off Port St Johns in winter weather.
What Anxin does: When the booking goes via the Cape, we apply the CINS stuffing checks (gaps, blocking, wall clearance) more strictly and ask for photos at every stage of packing.
The importer in Germany carries the check: CE marking on the battery and an EU declaration of conformity, translated into the language Germany asks for, have both been required since 18 August 2024 for batteries entering the EU market.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Germany importer. We check that the documents exist and match the goods; we do not assess conformity.
Regulation (EU) 2025/1561 pushed the Battery Regulation's due diligence duties for cobalt, lithium, nickel and natural graphite back to 18 August 2027 and gave the Commission until 26 July 2026 for its guidelines. Buyers in Germany are already collecting the supply-chain information they will need.
What Anxin does: We pass the Germany buyer's due diligence questions to the manufacturer and keep their answers with the shipment file; the policy itself remains the producer's responsibility.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Xiamen export filings, the carrier booking and the Germany import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Application fails pre-review and falls back to on-site inspection | Xiamen Customs | Data checked against the application first | Anxin with the manufacturer |
| Heavy weather off South Africa | Cape of Good Hope | CINS stuffing and blocking checks before sealing | Packing site, checked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Germany | Declaration and CE photo collected before loading | Manufacturer / importer |
Questions
The CE marking on the battery and the manufacturer's EU declaration of conformity, which must be available in the language Germany requires. Both have applied since 18 August 2024.
Ships of 5,000 GT and above calling at EU ports are in the EU Emissions Trading System, covering 50% of the emissions of a voyage from outside the EU. Lines must surrender allowances for 70% of 2025 emissions and 100% from 2027, and may pass the cost on as a surcharge.
For products that pass automatic pre-review, Xiamen Customs issues it through the single window; the case reported in August 2026 took about 10 minutes, against about half a day for the old on-site inspection. Products that do not pass pre-review still need inspection.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Xiamen → Bremen before any booking, and ask for missing battery documents first.
All destinations from Xiamen · Germany ports

Share the cargo facts; we review the route in writing.
Request a Quote